Panel Upgrades | Bexar County
Panel Upgrades in Alamo Heights, TX
100 amp to 200 amp is our specialty. Permitted, inspected, and built to code. Serving Alamo Heights and the San Antonio metro.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
When you need panel upgrades in Alamo Heights, you want it done once and done right. Straight pricing, clean work, and a warranty that means something.
Alamo Heights is full of homes built to last, and a lot of them still run on original panels and ungrounded circuits. That charm comes with old wiring, and old wiring is where we do some of our best work. Panel upgrades, grounding, and careful rewires that respect the house.
From the first call to the final walkthrough, your panel upgrades in Alamo Heights is handled by licensed, insured, background-checked techs who treat your home like their own.
What panel upgrades in Alamo Heights includes
- 100 amp to 200 amp service upgrades
- Panel and meter combo replacements
- Federal Pacific and Zinsco panel replacement
- Sub-panel installation for shops, additions, and pools
- Whole-home surge protection added at the panel
- Permit, utility coordination, and inspection handled
How does a panel upgrade in Alamo Heights work with the city and CPS Energy?
Two parties have to sign off. The City of Alamo Heights takes the permit, which a state licensed electrical contractor applies for, and inspects the new panel. CPS Energy, the city's electric utility, controls the meter and needs your city's successful electric inspection before it turns service on. We line up both before your power goes off.
CPS Energy routes a remodel with existing power that needs a temporary shutoff to its Remodel Department. Its renovation page also says that without the inspection, the electric meter is set and stays locked. That is why we call the city for inspection as soon as the panel is in.
Age is often the reason for the upgrade here. About half the homes in the city were built before 1950, by Census estimates, long before central air and a car charger shared one service.
Straight pricing
Free estimate. We come look at the panel, the meter, and the service, and give you a fixed price before anything starts.
Nearby
Panel Upgrades in other areas
More in Alamo Heights
Other services in Alamo Heights
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Panel Upgrades in Alamo Heights, answered
Straight answers. If you do not see yours, call us and ask.
How long does a panel upgrade take?
Most residential upgrades are a one-day job. There is a power-off window while we swap the panel and the utility reconnects. We schedule it so you are down for the shortest time possible.
Do you actually service Alamo Heights?
Yes. Alamo Heights is part of our regular San Antonio metro service area. You get the same flat-rate pricing and the same crew that serves the rest of the region.
Are you licensed to work in Alamo Heights?
Yes. We are a licensed and insured Texas electrical contractor and we pull the proper permits for work in Alamo Heights wherever code requires it.
Panel Upgrades in Alamo Heights, quoted flat
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked