Panel Upgrades | Guadalupe County
Panel Upgrades in Schertz, TX
100 amp to 200 amp is our specialty. Permitted, inspected, and built to code. Serving Schertz and the San Antonio metro.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
When you need panel upgrades in Schertz, you want it done once and done right. Straight pricing, clean work, and a warranty that means something.
Schertz keeps growing, and it is a mix. New construction that needs EV and generator prep, and older homes near the base that need panels and rewires. We cover both ends of that spread with the same flat-rate honesty.
From the first call to the final walkthrough, your panel upgrades in Schertz is handled by licensed, insured, background-checked techs who treat your home like their own.
What panel upgrades in Schertz includes
- 100 amp to 200 amp service upgrades
- Panel and meter combo replacements
- Federal Pacific and Zinsco panel replacement
- Sub-panel installation for shops, additions, and pools
- Whole-home surge protection added at the panel
- Permit, utility coordination, and inspection handled
What does a panel upgrade in Schertz involve?
A panel upgrade in Schertz means a city permit, work designed to the 2026 National Electrical Code, and a city inspection before your utility restores power. The city treats repair or replacement of the electrical service at the meter as work that needs a permit, and it inspects any job that needs a utility reconnection.
That inspection sets the order of the day. We confirm whether GVEC, CPS Energy or New Braunfels Utilities serves your address, plan the disconnect with that utility, change out the panel, and call for the city inspection so the reconnect can follow. If GVEC is yours, its rule is simple: GVEC repairs the equipment it owns, and the member hires a licensed electrician for everything on the house side.
Census estimates put the median Schertz home at 2002, so age is less often the reason here. The usual question is whether your panel has room for what you are adding, such as a car charger or a pool pump.
Straight pricing
Free estimate. We come look at the panel, the meter, and the service, and give you a fixed price before anything starts.
Nearby
Panel Upgrades in other areas
More in Schertz
Other services in Schertz
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Panel Upgrades in Schertz, answered
Straight answers. If you do not see yours, call us and ask.
Do I need a 200 amp panel?
If you are adding an EV charger, electric heat, or a large addition, almost always yes. We size the service to your real loads plus room to grow, not a guess.
Can you handle both my home and my rental in Schertz?
Absolutely. We work with homeowners and landlords across Schertz, from a single repair to a full panel upgrade or a turn between tenants.
How fast can you get to Schertz?
For most calls in Schertz we can offer same-day or next-day service during business hours. Call and we will give you the soonest honest window.
Panel Upgrades in Schertz, quoted flat
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked