Skip to content
Wattsmith Electric

Panel Upgrades | Bexar County

Panel Upgrades in Universal City, TX

100 amp to 200 amp is our specialty. Permitted, inspected, and built to code. Serving Universal City and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

When you need panel upgrades in Universal City, you want it done once and done right. Straight pricing, clean work, and a warranty that means something.

Universal City runs on Randolph, and that means a lot of veterans and active duty families. That is our crowd. On time, straight pricing, clean work. Panel upgrades, EV chargers, and repairs done the way you would expect from another veteran.

Every panel upgrades job in Universal City gets the Wattsmith Standard: on time, flat rate before work starts, a clean job site, and code-right work or we make it right.

What panel upgrades in Universal City includes

  • 100 amp to 200 amp service upgrades
  • Panel and meter combo replacements
  • Federal Pacific and Zinsco panel replacement
  • Sub-panel installation for shops, additions, and pools
  • Whole-home surge protection added at the panel
  • Permit, utility coordination, and inspection handled

How does CPS Energy fit into a panel upgrade in Universal City?

CPS Energy controls the power at your meter, so it sets the timing. The city's own winter storm page says CPS Energy is responsible for the electrical service in the Universal City area. When a remodel needs the service turned off for a while, CPS sends that work to its Remodel Department, and it needs your city permit and a passed city inspection before it turns permanent service on.

The city also lists GVEC as an electric provider, so we confirm which utility serves your address first.

On the code side, Universal City put the 2020 National Electrical Code into effect on September 1, 2020. That edition asks for surge protection and an outdoor emergency disconnect when a home's service is replaced, and we plan both into the job. With a median build year of 1984, many homes here are about four decades old, and a panel that came with the house is that old too.

Straight pricing

Free estimate. We come look at the panel, the meter, and the service, and give you a fixed price before anything starts.

FAQ

Panel Upgrades in Universal City, answered

Straight answers. If you do not see yours, call us and ask.

Do I need a 200 amp panel?

If you are adding an EV charger, electric heat, or a large addition, almost always yes. We size the service to your real loads plus room to grow, not a guess.

Can you handle both my home and my rental in Universal City?

Absolutely. We work with homeowners and landlords across Universal City, from a single repair to a full panel upgrade or a turn between tenants.

How fast can you get to Universal City?

For most calls in Universal City we can offer same-day or next-day service during business hours. Call and we will give you the soonest honest window.

Panel Upgrades in Universal City, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote