Skip to content
Wattsmith Electric

Electrical Repair | Comal County

Electrical Repair in New Braunfels, TX

We find the fault others miss, quote a flat rate, then fix it right. Serving New Braunfels and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Need electrical repair in New Braunfels? Wattsmith Electric quotes the number before we start, then does the work to code. Flat-rate pricing, no hourly meter.

New Braunfels is booming, and it shows in the work. New construction and additions on one side, historic downtown homes needing careful rewires on the other. We handle both, from rough-in to a delicate old-house panel swap.

From the first call to the final walkthrough, your electrical repair in New Braunfels is handled by licensed, insured, background-checked techs who treat your home like their own.

What electrical repair in New Braunfels includes

  • Tripping breakers and blown fuses traced to the source
  • Dead outlets, half-hot receptacles, and loose connections
  • Flickering or dimming lights and voltage drop
  • Burning smells, warm cover plates, and buzzing devices
  • Aluminum wiring pigtailing and failed backstab connections
  • Circuit tracing and load balancing

When does an electrical repair in New Braunfels need a city permit?

In New Braunfels the line falls at the wiring. The city's Building Permits page says swapping a light fixture or an appliance needs no permit as long as you are not altering or replacing wiring, but work on any electrical system does. A new circuit or a rebuilt burned connection goes through the Building Division.

Most homes in the city are fairly young. Census estimates put the median year built at 2006, and in a house that new a repair usually starts with a tripped AFCI or GFCI breaker, a failed device or a loose connection at an outlet. About one home in five here was built before 1980, and in those a dead outlet or a flicker calls for a look at the wire behind it, not just the device. If you smell burning or a breaker will not reset, turn that circuit off and call us. We find the cause first and then price the fix.

Straight pricing

Estimates are free. Troubleshooting is charged as its own line. You get the flat rate before any work starts.

FAQ

Electrical Repair in New Braunfels, answered

Straight answers. If you do not see yours, call us and ask.

Do you charge to diagnose the problem?

Estimates are free. If the tech has to troubleshoot a problem, that is a flat fee for finding the fault, charged as its own line and not taken off the repair. You approve the repair price before we start. No guessing, no open-ended hourly meter.

Do you actually service New Braunfels?

Yes. New Braunfels is part of our regular San Antonio metro service area. You get the same flat-rate pricing and the same crew that serves the rest of the region.

Are you licensed to work in New Braunfels?

Yes. We are a licensed and insured Texas electrical contractor and we pull the proper permits for work in New Braunfels wherever code requires it.

Electrical Repair in New Braunfels, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote