Whole Home Rewiring | Comal County
Whole Home Rewiring in New Braunfels, TX
Old wiring pulled out, new wiring run to code, your home made safe. Serving New Braunfels and the San Antonio metro.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Wattsmith Electric handles whole home rewiring in New Braunfels with no guessing and no surprise invoices. Honest flat-rate work from a crew that shows up squared away.
New Braunfels is booming, and it shows in the work. New construction and additions on one side, historic downtown homes needing careful rewires on the other. We handle both, from rough-in to a delicate old-house panel swap.
You get one flat number for your New Braunfels project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.
What whole home rewiring in New Braunfels includes
- Full and partial rewires for older homes
- Knob and tube and cloth wiring removal
- Aluminum branch circuit replacement or remediation
- Grounding and bonding brought to current code
- New receptacles, switches, and GFCI or AFCI protection
- Panel replacement coordinated with the rewire
Which New Braunfels homes are old enough to need rewiring?
Start with the houses built before about 1970. Census figures for New Braunfels count about 5,100 homes from the 1960s or earlier, roughly one in nine, and about 1,400 of them date to 1939 or before. Those are the homes where cloth insulated wire, two prong ungrounded outlets and even knob and tube can still sit behind the plaster.
The 1970s added about 3,700 more homes, and houses from that period sometimes carry aluminum branch circuits that need the right connectors or new copper. Rewiring changes the electrical system, so it goes through the city's Building Division for a permit and inspection. The city also lists a separate permit type for alterations to historical properties, so a designated historic house can need that review too. We test every circuit before we quote, and we open as few walls as the work allows, so you know which rooms need new wire and which can stay.
Straight pricing
Free estimate. We walk the job first, since scope, access, and finishes all matter, then give you one fixed number before anything starts.
Nearby
Whole Home Rewiring in other areas
More in New Braunfels
Other services in New Braunfels
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Whole Home Rewiring in New Braunfels, answered
Straight answers. If you do not see yours, call us and ask.
Can I live in the house during a rewire?
Usually yes. We work in sections and keep power on where we can. We plan the outage windows with you so daily life keeps moving.
How fast can you get to New Braunfels?
For most calls in New Braunfels we can offer same-day or next-day service during business hours. Call and we will give you the soonest honest window.
Can you handle both my home and my rental in New Braunfels?
Absolutely. We work with homeowners and landlords across New Braunfels, from a single repair to a full panel upgrade or a turn between tenants.
Whole Home Rewiring in New Braunfels, quoted flat
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked