Whole Home Rewiring | Bexar County
Whole Home Rewiring in Alamo Heights, TX
Old wiring pulled out, new wiring run to code, your home made safe. Serving Alamo Heights and the San Antonio metro.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Wattsmith Electric handles whole home rewiring in Alamo Heights with no guessing and no surprise invoices. Honest flat-rate work from a crew that shows up squared away.
Alamo Heights is full of homes built to last, and a lot of them still run on original panels and ungrounded circuits. That charm comes with old wiring, and old wiring is where we do some of our best work. Panel upgrades, grounding, and careful rewires that respect the house.
You get one flat number for your Alamo Heights project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.
What whole home rewiring in Alamo Heights includes
- Full and partial rewires for older homes
- Knob and tube and cloth wiring removal
- Aluminum branch circuit replacement or remediation
- Grounding and bonding brought to current code
- New receptacles, switches, and GFCI or AFCI protection
- Panel replacement coordinated with the rewire
How many Alamo Heights homes are old enough to need rewiring?
A large share. Census estimates for 2020 to 2024 count about 1,220 of the city's roughly 3,700 housing units as built in 1939 or earlier, about one in three, and close to three in four as built before 1980. The median year built for the whole city is 1950.
Those decades are where we expect knob and tube, cloth insulated cable and ungrounded two-prong outlets, and in some 1960s and 1970s houses, aluminum branch circuits. We confirm what your house has by opening boxes and testing, not by guessing from the year.
A rewire changes an existing building, so it goes through the city's permit and inspection process and is built to the 2020 National Electrical Code that Alamo Heights adopted. Because the city keeps construction to weekday hours, we stage the job room by room so your kitchen and baths come back first.
Straight pricing
Free estimate. We walk the job first, since scope, access, and finishes all matter, then give you one fixed number before anything starts.
Nearby
Whole Home Rewiring in other areas
More in Alamo Heights
Other services in Alamo Heights
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Whole Home Rewiring in Alamo Heights, answered
Straight answers. If you do not see yours, call us and ask.
Do you have to tear open all my walls?
No. We fish new wire through existing cavities wherever we can and open drywall only where access demands it. We tell you up front where patching will be needed so there are no surprises.
Are you licensed to work in Alamo Heights?
Yes. We are a licensed and insured Texas electrical contractor and we pull the proper permits for work in Alamo Heights wherever code requires it.
Do you actually service Alamo Heights?
Yes. Alamo Heights is part of our regular San Antonio metro service area. You get the same flat-rate pricing and the same crew that serves the rest of the region.
Whole Home Rewiring in Alamo Heights, quoted flat
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked