Skip to content
Wattsmith Electric

Rewiring

Knob and Tube Wiring: What It Is and Where It Still Turns Up

August 5, 2026Last updated 9 min readWattsmith Electric · TECL 41806

Key takeaways

  • Knob and tube was the standard residential method from roughly the 1880s into the 1940s. It has no equipment grounding conductor, which is the single fact that drives most of the trouble it causes today.
  • NEC 394.12 prohibits concealed knob and tube in hollow spaces filled with insulation. Blown-in attic insulation over live knob and tube is the most common way a house fails an inspection on this.
  • The wiring is not automatically unsafe. Original, undisturbed, correctly loaded knob and tube can be in serviceable condition. What makes it dangerous is age-embrittled insulation and decades of amateur splices.
  • In San Antonio it is uncommon rather than absent. The metro's housing is mostly postwar, so knob and tube shows up in the pockets that predate 1940 rather than across the city.

Knob and tube wiring is the method that predates the cable in your walls. Two separate conductors, a hot and a neutral, run through open framing on ceramic knobs and pass through joists inside ceramic tubes. It was the residential standard from roughly the 1880s into the 1940s, and in houses that were never rewired, some of it is still energized.

Most of what gets said about it is half right. It is not automatically a fire waiting to happen, and it is also not fine just because the lights still work. The useful version is more specific than either.

What knob and tube wiring actually is

The hot and the neutral are run separately, several inches apart, supported on porcelain knobs and held clear of framing. That separation is the design. Air is the insulation, and the conductors were meant to shed heat into open space rather than into anything touching them.

The conductors themselves are copper, wrapped in rubber and then in a cotton or asphalt-saturated cloth braid. That braid is how most people recognize it, and it is also the part that ages worst.

There is no third conductor. Knob and tube has no equipment grounding conductor at all, because the concept was not part of residential practice when it was installed. That single absence drives most of what follows.

The rule that catches people

If you take one code citation from this post, take NEC 394.12. It lists the places concealed knob and tube is not permitted, and one of them is hollow spaces and enclosures filled with thermal insulation.

That is the collision. A house with original wiring in the attic gets an energy retrofit, somebody blows cellulose or fiberglass across the whole floor, and conductors designed to run in open air are now packed in insulation that holds their heat against them. The wiring was compliant before the insulation truck arrived and is not after.

It is a common finding because the two trades rarely talk. An insulation crew is not looking at wiring methods, and the homeowner buying an attic upgrade has no reason to know the interaction exists.

Why the absent ground matters more than the age

Every three-prong outlet in a knob and tube house is fed by two wires. Whatever is behind the faceplate, there is no equipment grounding conductor in that circuit, which means the outlet is reporting a protection it does not have. That is the same condition, arrived at from a different direction, that we cover in what an open ground reading means and in two prong outlets in older San Antonio homes.

The practical consequence is the same as it is on any ungrounded circuit. A fault inside an appliance that energizes its metal case has no low resistance path back to the panel, so the breaker does not clear it and the case stays live.

What actually makes a given house a problem

  • Embrittled insulation. Rubber that is eighty years old cracks when it is moved, and moving it is exactly what happens when somebody works in the attic.
  • Splices outside boxes. Original knob and tube used soldered and taped splices in open air, which was the accepted method. Later additions were often spliced the same way by people who were not electricians.
  • Modern load on original circuits. These circuits were sized for lighting and a small appliance, not a window unit and a space heater.
  • Insulation contact, as above.
  • Mixed vintages. A house rewired in part can leave original runs feeding a back room, so a tester in the kitchen tells you nothing about the bedroom.

Where it turns up here

San Antonio is not Boston. The metro's housing stock is overwhelmingly postwar, so the great majority of homes in this market were wired long after knob and tube stopped going in. Treating it as a citywide problem would be inventing a problem.

Where it is real is the housing that predates about 1940, which in this metro means specific older pockets rather than whole suburbs. The same neighbourhoods that carry other pre-war conditions are the ones worth checking, and we wrote about that housing in panel upgrades in Monte Vista historic homes and electrical problems in Alamo Heights older homes.

Even in those, partial is more likely than total. Houses that old have usually had at least one round of work, and what survives is whatever nobody had a reason to open up.

What we would do about it

Start by establishing scope, because that is the number that decides everything else. How many circuits are original, what do they feed, and is the insulation intact where it can be seen. That is an assessment, not a quote.

If the answer is a few circuits feeding lighting in one part of the house, staged replacement is reasonable and the order should follow risk. If the answer is the whole house, the conversation is a rewire and the signals are laid out in signs your San Antonio home needs a rewire, with the money side in what it costs to rewire a house.

If the pressure is coming from an insurer rather than from a symptom, the letter they want is usually about condition and load rather than about removal, and that is worth establishing before committing to anything. We covered that conversation in what it means when your insurer flags your wiring. An electrical inspection is how we put a number on scope, and house rewiring is what it turns into when the answer is everything.

What replacing it costs, and how the work is staged room by room, is in knob and tube wiring replacement cost. If you would rather have the number for your own house, request a flat-rate quote.

FAQ

Common questions

Straight answers. If you do not see yours, call us and ask.

Is knob and tube wiring safe?

It depends on its condition and what has been done to it, not on its age alone. Knob and tube that is original, undisturbed, correctly loaded and not buried in insulation can still be functioning as designed. What makes it hazardous in practice is the rubber and cloth insulation becoming brittle after eighty or more years, amateur splices made outside a junction box, modern loads on circuits designed for a lamp and a radio, and thermal insulation packed over conductors that were engineered to shed heat into open air.

Do I have to replace knob and tube wiring?

No code requires you to remove wiring that was legal when installed and remains in serviceable condition. What forces the issue is usually one of three things: an insurer that declines or surcharges the policy, a lender or buyer during a sale, or an insulation project, because NEC 394.12 does not permit concealed knob and tube in hollow spaces filled with insulation. Many owners replace it in stages rather than all at once, starting with the circuits that feed kitchens, baths and anything with a metal case.

Why will insurers not cover knob and tube wiring?

Because they are pricing the condition of eighty-year-old insulation and the history of alterations, neither of which they can see from an application. The wiring has no ground, its original insulation embrittles with age, and houses that still have it have usually had decades of additions spliced in by whoever was available. Insurers differ: some decline outright, some surcharge, and some accept it with an electrician's letter confirming condition and load. It is worth asking what specifically your carrier needs before assuming a full rewire is the only route.

Is knob and tube wiring common in San Antonio?

Not across the metro. San Antonio's housing stock is heavily postwar, so the great majority of homes here were wired well after knob and tube stopped being installed. Where it turns up is in the neighbourhoods built before about 1940, and even there it is often partial: a house that was rewired in the 1960s can still have original circuits in an attic or a back bedroom that nobody got to.

Related help

Where to go from here

Ready to get it handled?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote