Whole Home Rewiring | Bexar County
Whole Home Rewiring in Universal City, TX
Old wiring pulled out, new wiring run to code, your home made safe. Serving Universal City and the San Antonio metro.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Universal City homeowners call Wattsmith Electric for whole home rewiring. We find what others miss, price it flat, and do the work right the first time. Dependable from the first call.
Universal City runs on Randolph, and that means a lot of veterans and active duty families. That is our crowd. On time, straight pricing, clean work. Panel upgrades, EV chargers, and repairs done the way you would expect from another veteran.
You get one flat number for your Universal City project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.
What whole home rewiring in Universal City includes
- Full and partial rewires for older homes
- Knob and tube and cloth wiring removal
- Aluminum branch circuit replacement or remediation
- Grounding and bonding brought to current code
- New receptacles, switches, and GFCI or AFCI protection
- Panel replacement coordinated with the rewire
Should I rewire my 1970s home in Universal City?
Not always, but you should have it checked. Census estimates for 2020 to 2024 count about 3,540 of Universal City's roughly 8,440 housing units as built before 1980, around 42 percent, and about 3,150 of those went up in the 1960s and 1970s.
That era is when some builders ran aluminum branch wiring, and many older houses still have two-prong outlets with no ground. We open a few boxes, test the circuits and tell you whether the honest fix is a full rewire or a handful of runs.
When the job goes ahead, a registered electrician files the permit, since the city does not let homeowners pull electrical permits. New wiring is built to the 2020 National Electrical Code, the edition Universal City adopted, which means arc fault and ground fault protection where that code calls for it. We pull new cable a room at a time and get the kitchen and baths working again first.
Straight pricing
Free estimate. We walk the job first, since scope, access, and finishes all matter, then give you one fixed number before anything starts.
Nearby
Whole Home Rewiring in other areas
More in Universal City
Other services in Universal City
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Whole Home Rewiring in Universal City, answered
Straight answers. If you do not see yours, call us and ask.
Do you have to tear open all my walls?
No. We fish new wire through existing cavities wherever we can and open drywall only where access demands it. We tell you up front where patching will be needed so there are no surprises.
Are you licensed to work in Universal City?
Yes. We are a licensed and insured Texas electrical contractor and we pull the proper permits for work in Universal City wherever code requires it.
Do you actually service Universal City?
Yes. Universal City is part of our regular San Antonio metro service area. You get the same flat-rate pricing and the same crew that serves the rest of the region.
Whole Home Rewiring in Universal City, quoted flat
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked