Whole Home Rewiring | Guadalupe County
Whole Home Rewiring in Schertz, TX
Old wiring pulled out, new wiring run to code, your home made safe. Serving Schertz and the San Antonio metro.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Wattsmith Electric handles whole home rewiring in Schertz with no guessing and no surprise invoices. Honest flat-rate work from a crew that shows up squared away.
Schertz keeps growing, and it is a mix. New construction that needs EV and generator prep, and older homes near the base that need panels and rewires. We cover both ends of that spread with the same flat-rate honesty.
You get one flat number for your Schertz project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.
What whole home rewiring in Schertz includes
- Full and partial rewires for older homes
- Knob and tube and cloth wiring removal
- Aluminum branch circuit replacement or remediation
- Grounding and bonding brought to current code
- New receptacles, switches, and GFCI or AFCI protection
- Panel replacement coordinated with the rewire
Do older homes in Schertz need rewiring?
Most Schertz homes are too new to need it, but the older ones deserve a look. Census estimates for 2020 to 2024 count about 2,880 of the city's roughly 16,570 housing units as built before 1980, close to one in six, and about 1,540 of them date from the 1960s or earlier.
Those are the houses where we look for ungrounded two-prong circuits, cloth-jacketed cable, and aluminum branch wiring of the kind used in the late 1960s and 1970s. A rewire here falls under the city's permit rule for installing or altering permanent wiring, and the new circuits are inspected against the 2026 National Electrical Code that Schertz now enforces.
We open walls only where we have to, pull new cable room by room, and set the order so your kitchen and bathrooms come back first. Buying a pre-1980 house? An inspection before closing tells you whether the honest answer is a full rewire or a handful of circuits.
Straight pricing
Free estimate. We walk the job first, since scope, access, and finishes all matter, then give you one fixed number before anything starts.
Nearby
Whole Home Rewiring in other areas
More in Schertz
Other services in Schertz
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Whole Home Rewiring in Schertz, answered
Straight answers. If you do not see yours, call us and ask.
Will this help with insurance?
Often, yes. Many insurers will not write or renew a policy on knob and tube or aluminum wiring. A documented, permitted rewire clears that flag and we provide the paperwork.
Do you offer emergency electrical service in Schertz?
We keep room for urgent calls in Schertz. If you have a burning smell, a dead panel, or a real safety issue, call us and we will get to you as fast as we safely can.
Do you charge extra to come out to Schertz?
No trip-charge games. Schertz is inside our service area, so you get straight flat-rate pricing on the work itself, quoted before we start.
Whole Home Rewiring in Schertz, quoted flat
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked