Skip to content
Wattsmith Electric

Whole Home Rewiring | Kendall County

Whole Home Rewiring in Boerne, TX

Old wiring pulled out, new wiring run to code, your home made safe. Serving Boerne and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Boerne homeowners call Wattsmith Electric for whole home rewiring. We find what others miss, price it flat, and do the work right the first time. Dependable from the first call.

Boerne is ranch country. Long service runs, well and septic pumps, gates, barns, and shops. We plan power across the whole property, set sub-panels where they belong, and back it all with generator options for when the grid drops.

You get one flat number for your Boerne project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.

What whole home rewiring in Boerne includes

  • Full and partial rewires for older homes
  • Knob and tube and cloth wiring removal
  • Aluminum branch circuit replacement or remediation
  • Grounding and bonding brought to current code
  • New receptacles, switches, and GFCI or AFCI protection
  • Panel replacement coordinated with the rewire

Which Boerne homes are old enough to need rewiring?

Mostly the houses built before 1980, and in Boerne they are a minority. Census estimates for 2020 to 2024 count about 1,200 of the city's 8,240 housing units as built before 1980, roughly 15 percent, and close to 400 date from 1939 or earlier. Those are the homes where cloth insulated wire, ungrounded outlets and old splices still turn up.

A house from that era was wired for far less load than a family uses today, and many have no ground at the receptacles. Rewiring replaces the branch circuits room by room, adds grounding, and brings the work up to the 2023 National Electrical Code that Boerne's Permitting and Code Compliance office enforces. City staff inspect it.

When the old service is too small as well, the panel and meter loop usually go in the same project, coordinated with whichever utility serves the address, so the house is opened up only once.

Straight pricing

Free estimate. We walk the job first, since scope, access, and finishes all matter, then give you one fixed number before anything starts.

FAQ

Whole Home Rewiring in Boerne, answered

Straight answers. If you do not see yours, call us and ask.

Will this help with insurance?

Often, yes. Many insurers will not write or renew a policy on knob and tube or aluminum wiring. A documented, permitted rewire clears that flag and we provide the paperwork.

Do you offer emergency electrical service in Boerne?

We keep room for urgent calls in Boerne. If you have a burning smell, a dead panel, or a real safety issue, call us and we will get to you as fast as we safely can.

Do you charge extra to come out to Boerne?

No trip-charge games. Boerne is inside our service area, so you get straight flat-rate pricing on the work itself, quoted before we start.

Whole Home Rewiring in Boerne, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote