Skip to content
Wattsmith Electric

Lighting

Under Cabinet Lighting Installation: Hardwired, Plug-In or Low Voltage

November 22, 2026Last updated 5 min readWattsmith Electric · TECL 41806

Key takeaways

  • Hardwired fixtures run on a house circuit and a wall switch; plug-in fixtures run from an outlet; low voltage LED runs from a driver.
  • The driver and the switch location decide most of the work.
  • In a finished kitchen, wires go through the cabinets or the wall, never stapled along the counter.

Under cabinet lighting installation turns a dim counter into a place you can actually cut on. There are three ways to do it, and the right one depends on whether the kitchen is open walls or finished cabinets. All three are part of our lighting installation work.

What are the three kinds of under cabinet lighting?

  • Hardwired line voltage fixtures, fed from a house circuit and run from a wall switch.
  • Plug-in fixtures, which plug into an outlet, often one hidden in a cabinet.
  • Low voltage LED tape or puck lights, run from a driver that changes house power down.

Which one is best?

Hardwired looks cleanest and works from a wall switch like any other light. Low voltage LED gives the thinnest profile and the most even light, and it is the usual choice now. Plug-in is the easiest to add to a finished kitchen, but you see a cord unless an outlet goes inside the cabinet.

Where does the driver go?

Low voltage lights need a driver, a small box that powers the LEDs. It goes somewhere you can reach it later, usually inside a cabinet or above it, never sealed behind a wall. The driver is sized to the total length of light it runs, with room to spare.

How do the wires stay hidden?

In a remodel with open walls, we run the cable in the wall to a box behind each run. In a finished kitchen, the cable goes through the back of the cabinets, along the underside behind the front lip, or above the cabinets and down. What we do not do is staple cable along the backsplash.

How bright should under cabinet lights be, and what color?

Bright enough to work by without glare off a polished counter. Most kitchens look best with a warm to neutral white, around 2700K to 3000K, matched to the ceiling lights so the room reads as one color. A diffused lens or a channel over LED tape hides the individual dots on a glossy backsplash.

Mount the light toward the front edge of the cabinet, not against the wall, so it lands on the counter where you work instead of lighting the backsplash.

What about the switch?

A wall switch is the most natural. Many LED drivers dim, but the dimmer has to be one the driver lists. If there is no switch where you want one, a new switch box is part of the job. If you want it on a smart switch, read our guide on the smart switch neutral wire first.

Does it need its own circuit?

Rarely. LED under cabinet lighting draws little power, and it usually ties into an existing lighting circuit. It should not tie into the kitchen counter circuits, which the National Electrical Code keeps for the counter outlets.

What should I do next?

Measure the length of each cabinet run, note where you want the switch, and tell us whether the cabinets are in or coming out on the lighting installation page. For ceiling light, see IC rated recessed lights in older homes.

Related help

Where to go from here

Ready to get it handled?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote