Key takeaways
- The box in the ceiling decides what you can hang. A heavy fixture or a fan needs a box rated for it.
- LED fixtures and dimmers have to be matched, or the light flickers or hums.
- Have the fixture on site and out of the box, and know where you want it, and the visit goes quickly.
Hanging a new light fixture, a light fixture installation in our terms, can take twenty minutes or most of a morning, and the difference is almost always what is behind the old fixture. This is what an electrician looks at, what changes for heavy fixtures and dimmers, and what you can do before the visit so it goes smoothly.
What does the electrician check first?
- The electrical box: is there one, is it fastened to the framing, and is it rated for the weight?
- The wiring in the box: its age, its condition, and whether there is a ground.
- The circuit: what else is on it and whether it is protected properly.
- The switch: whether it is a dimmer, a smart switch or a three-way, and whether it suits the new fixture.
Older San Antonio homes often have a fixture screwed to a bare board, or a box that was fine for a single bulb and nothing heavier. A new fixture goes on a proper box, every time.
Do heavy fixtures and chandeliers need anything special?
Yes. The National Electrical Code limits how much weight an ordinary outlet box can carry and requires a box listed for the weight above that, or support that does not depend on the box. A large chandelier may need a brace between the joists. A ceiling fan always needs a box listed for fan support, because a fan moves. Our guide on replacing a light with a ceiling fan covers that one.
Why does my new LED light flicker on the dimmer?
Most flicker and hum comes from a dimmer made for old incandescent bulbs driving a modern LED. LED fixtures want a dimmer listed as compatible with them, and the fixture's own instructions usually name one or two. If you are changing fixtures, change the dimmer with it.
Smart switches have their own catch: many need a neutral wire in the switch box, which older houses often do not have. We cover that in the guide to smart switches.
How should I get ready for the visit?
- Have the fixture on site, out of the box, with every part and the instructions.
- Know exactly where it goes and how low it should hang.
- Clear the floor underneath, and move anything fragile.
- Tell us if the ceiling is high, sloped or textured, so the right ladder comes.
- If it is a new location with no box, say so when you book. That is new wiring, not a swap.
Is a new light location a bigger job?
It is. Adding a light where there is none means running a new cable from a switch or another box, cutting in a box rated for the fixture, and patching. Recessed lights are their own topic: our guide to IC rated recessed lights in older homes explains the insulation question, and under cabinet lighting covers kitchen task light.
Do I need an electrician to change a light?
Texas licenses electricians and electrical contractors through TDLR, and you can check any license on TDLR's electrician pages. Changing a fixture means working on a circuit and a box, and those are where the problems are, which is exactly what a fixture swap opens up.
Tell us what you are hanging and where on the lighting installation page. You get a written price before the work starts.