Skip to content
Wattsmith Electric

Lighting Installation | Guadalupe County

Lighting Installation in Cibolo, TX

Recessed cans, ceiling fans, and landscape lighting placed with intent. Serving Cibolo and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Need lighting installation in Cibolo? Wattsmith Electric quotes the number before we start, then does the work to code. Flat-rate pricing, no hourly meter.

Cibolo filled up fast with newer family homes, and those families are adding EV chargers, hot tubs, and generators. We size the panel for it, wire it clean, and make sure the additions do not overload what the builder installed.

Every lighting installation job in Cibolo gets the Wattsmith Standard: on time, flat rate before work starts, a clean job site, and code-right work or we make it right.

What lighting installation in Cibolo includes

  • Recessed can and canless LED layout and installation
  • Ceiling fan installation and fan-rated box replacement
  • Landscape and pathway lighting with transformers and timers
  • Under-cabinet, cove, and accent lighting
  • Dimmer and smart switch installation
  • Fixture swaps, chandeliers, and high-ceiling work

What goes into a lighting project in a Cibolo house?

In most of Cibolo, a lighting job happens in a fairly new house. Census puts the median build year at 2008, and about nine in ten housing units are single family detached homes, which usually means drywall ceilings, attic access and modern cable. That makes recessed lights, new fixtures and ceiling fans simple to add without much patching.

Outside, the questions change. Exterior and landscape lighting needs fixtures rated for wet locations, GFCI protection where the code calls for it, and a plan for where the light lands, including your neighbor's windows. If your neighborhood has a homeowners association, its governing documents may say something about exterior lights; the city even runs an HOA workshop series that covers how to read them. A new circuit or outdoor feed is electrical work that Cibolo permits, and every fan we hang goes on a box rated to carry it.

Straight pricing

Lighting is quoted flat by scope. We count the fixtures, the switching, and the access, then give you one price.

FAQ

Lighting Installation in Cibolo, answered

Straight answers. If you do not see yours, call us and ask.

Do you do landscape lighting?

Yes. We install low-voltage landscape and pathway lighting with the right transformer, timers or photocells, and buried runs that stay hidden and hold up.

Do you charge extra to come out to Cibolo?

No trip-charge games. Cibolo is inside our service area, so you get straight flat-rate pricing on the work itself, quoted before we start.

Do you offer emergency electrical service in Cibolo?

We keep room for urgent calls in Cibolo. If you have a burning smell, a dead panel, or a real safety issue, call us and we will get to you as fast as we safely can.

Lighting Installation in Cibolo, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote