Skip to content
Wattsmith Electric

Lighting Installation | Bexar County

Lighting Installation in Universal City, TX

Recessed cans, ceiling fans, and landscape lighting placed with intent. Serving Universal City and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Wattsmith Electric handles lighting installation in Universal City with no guessing and no surprise invoices. Honest flat-rate work from a crew that shows up squared away.

Universal City runs on Randolph, and that means a lot of veterans and active duty families. That is our crowd. On time, straight pricing, clean work. Panel upgrades, EV chargers, and repairs done the way you would expect from another veteran.

We serve Universal City out of San Antonio with the same crew and the same flat-rate honesty we bring to every community in the metro. Your quote is your price.

What lighting installation in Universal City includes

  • Recessed can and canless LED layout and installation
  • Ceiling fan installation and fan-rated box replacement
  • Landscape and pathway lighting with transformers and timers
  • Under-cabinet, cove, and accent lighting
  • Dimmer and smart switch installation
  • Fixture swaps, chandeliers, and high-ceiling work

Does my HOA or the city have a say in new lighting at my Universal City house?

Both can. Universal City's permit FAQ says that if you live in a deed restricted subdivision you must contact your homeowners association for its requirements and also follow city code, and that city code wins where it is more restrictive. Read your deed restrictions before a fixture goes on the front of the house or along the drive.

On the city side, electrical work is on the list of jobs that need a permit before work starts, and only a state licensed electrician registered with the city can pull it. A new landscape circuit, added recessed lights or a ceiling fan on a new box all fall under that.

Inside, we plan the switching first, then the fixtures. A fan has to hang from a box rated for its weight, and recessed cans in an insulated ceiling need housings rated for contact with insulation.

Straight pricing

Lighting is quoted flat by scope. We count the fixtures, the switching, and the access, then give you one price.

FAQ

Lighting Installation in Universal City, answered

Straight answers. If you do not see yours, call us and ask.

Can you install a fan where there is only a light?

Yes, but the box has to be fan-rated to carry the weight and the motion. A standard light box is not. We replace it with a proper fan-rated box so the fan stays put.

How fast can you get to Universal City?

For most calls in Universal City we can offer same-day or next-day service during business hours. Call and we will give you the soonest honest window.

Can you handle both my home and my rental in Universal City?

Absolutely. We work with homeowners and landlords across Universal City, from a single repair to a full panel upgrade or a turn between tenants.

Lighting Installation in Universal City, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote