Key takeaways
- Put motion lights where people approach: drives, side gates, back doors and dark corners.
- Aim the sensor across the path, not straight at it, and keep it away from streets and trees.
- Outdoor fixtures need weather-rated boxes and covers, and outdoor outlets need GFCI protection.
Motion sensor security lighting installation is a small job that changes how a house feels at night. The light comes on when someone walks up, and goes off when they leave. Where it goes and how it is aimed matter more than the fixture. It is part of our lighting installation work, alongside outdoor and landscape light.
Where should motion lights go?
- Over the driveway and the garage door.
- At side gates and side yards, the paths people use when they do not want to be seen.
- Over the back door and the patio.
- Dark corners of the house where nothing else reaches.
How should the sensor be aimed?
Motion sensors see movement across their field best. Aim the sensor so a person walks across it, not straight toward it. Keep it away from the street, so passing cars do not set it off, and away from trees and bushes that move in the wind. Then set the range and the time it stays on.
Why does my motion light stay on, or never come on?
Stays on: it is seeing something that keeps moving, such as branches, a flag or heat from a vent, or the sensitivity is too high. Never comes on: the dusk sensor thinks it is daytime because a porch light shines on it, the sensor is aimed too high, or the fixture is on a switch someone turned off. Most of these are fixed by aiming and settings, not a new fixture.
What does an outdoor fixture need?
A box and cover rated for wet locations, sealed against rain, and a fixture listed for outdoor use. Any outdoor outlet on the way needs GFCI protection under the National Electrical Code. Our guide on where GFCI outlets are required lists the rest.
Is a new outdoor light a bigger job than a swap?
A swap on an existing box is quick. A new location means a new cable from a switch or the panel, a new weatherproof box, and sealing the hole through the wall. On brick, the drill and the anchors take longer. We tell you which it is when we see it.
Should it be on a switch, or always ready?
Most homeowners leave the switch on so the sensor is always ready, and use the fixture's override when they want it on for a while. Some fixtures and smart switches let you do that from a phone. Put the switch somewhere inside where you will not turn it off by habit.
What should I do next?
Walk around the house after dark and note where it is darkest, then tell us on the lighting installation page. For indoor fixtures, see light fixture installation.