
Service
Smoke Detector and CO Alarm Installation in San Antonio
Hardwired and interconnected, so when one sounds, they all sound.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Same day
Appointments available
Flat rate
Approved before work begins
TECL 41806
Licensed and insured
8am to 8pm
Open every day
Electrical emergency? Sparks, burning smell, or a dead panel: call (210) 446-5446 now
Emergency service$49 Off
Your First Service Call
New customers take $49 off their first diagnostic or service call with Wattsmith Electric.
New residential customers only. One per household. Valid on your first service call only. Not combinable with other offers. No cash value. Mention this offer when you book.
Our service guarantees
- We hit your window. Miss it with no heads-up, and that is $149 off.
- You approve one flat price before we touch a wire. No hourly meter.
- We protect your floors, haul our mess, and leave the space clean.
- Everything meets code and we stand behind it, or we come back and fix it.
Wattsmith Electric works to the 2023 National Electrical Code and pulls the permit where one is required. How we handle permits, inspections and the workmanship guarantee is on our standards page. The license, the coverage in force and our federal registrations, including the certificate of insurance process for contractors, are on insurance and licensing.
Why it does not pay to wait
Dead, missing, or unlinked detectors are the difference between a warning and a tragedy. Carbon monoxide has no smell, and a fire at night gives you seconds. This is the lowest-cost, highest-stakes electrical work in the whole house.
A smoke alarm in the hallway does you no good if the fire starts in a back bedroom and you never hear it in time. Code calls for interconnected detectors for a reason. When one goes off, they all go off, and you get the seconds that matter.
We install hardwired, interconnected smoke and carbon monoxide detectors with battery backup, placed where code and common sense put them. It is a small job that protects the people who matter most.
What smoke detector installation covers
- Hardwired interconnected smoke detectors
- Combination smoke and carbon monoxide detectors
- Battery backup on every device
- Proper placement per code in bedrooms and hallways
- Replacement of expired or chirping units
- Interconnect added to existing standalone alarms
What you can check yourself first
Before you call, here is what you can safely check on your own. Even if you still call us, you will walk in knowing more than you did.
- Press the test button on each detector. No chirp or no sound means it is due.
- Check the date on the back. Most smoke units expire at ten years, CO units sooner.
- Note whether they are interconnected: does one going off set them all off?
- Count the bedrooms. Code wants one in each sleeping room, outside each sleeping area, and on every level.
Straight pricing
Detector work is quoted flat by count and access. We tell you how many you need and where, then price it.
- Up to three options on a job, each a real way to do it, priced flat. You choose the scope.
- Estimates are free. Troubleshooting is charged as its own line.
- The price you approve is the price you pay.
Book your detector install
Flat-rate quote before any work starts. A Wattsmith electrician calls you back within 15 minutes during business hours.
Where we work
Smoke and CO Detectors across the San Antonio metro
We bring smoke and co detectors to San Antonio and the surrounding communities. Find your area below or call and we will confirm we cover you.
We do smoke and co detectors across the rest of the metro too, including Live Oak, Selma, Timberwood Park, Hollywood Park, Castle Hills, Windcrest, Kirby, Alamo Ranch, Westover Hills, Medical Center, Bulverde, Fair Oaks Ranch, Terrell Hills, Olmos Park, Shavano Park, Garden Ridge, Spring Branch, Canyon Lake, Seguin, Marion, Saint Hedwig, Adkins, La Vernia, Elmendorf, China Grove, Von Ormy, Somerset, Lytle, Castroville and Floresville.
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Smoke and CO Detectors questions
Straight answers. If you do not see yours, call us and ask.
How often should smoke detectors be replaced?
Every ten years, even hardwired ones. The sensor degrades whether it has alarmed or not. If yours are older than a decade or the date is worn off, they are due.
Why do I need carbon monoxide detectors?
Carbon monoxide is odorless and deadly, and gas appliances, water heaters, and attached garages all produce it. Combination detectors cover both threats with one device in the right spots.
My detectors chirp even with new batteries. Why?
That usually means the unit is at end of life or there is a wiring or interconnect fault. We diagnose it and replace what is failing so the chirping stops for good.
Keep exploring
Related work and guides
Related services
Need smoke and co detectors done right?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked