What we respond to
A dead circuit or a dead building, a main breaker that will not reset, a failed feed to a cooler, a kitchen line or a production machine, a burning smell, scorched equipment, sparking, water near electrical, or a parking lot gone dark.
- Loss of power to a building, a suite or a key load
- Burning smells, heat, sparking or water near equipment
- Lighting failures that leave a site unsafe