Commercial EV and fleet charging installation

Charging infrastructure for workplaces, retail centers, multifamily properties, and fleet yards in the San Antonio metro, from the load study through commissioning.

Load study

Every project starts with the math

L2 + DCFC

Level 2 and DC fast charging

Phase ready

Built for future expansion

Turnkey

Permits through commissioning

Why does a commercial EV charging project start with a load study?

Because most charging projects fail at the service entrance, not the parking space. A load study of your existing service sizes the infrastructure for the chargers you need now and the ones you will add later, and conduit runs are designed so the second phase costs a fraction of the first.

Most charging projects fail at the service entrance, not the parking space. We start with a load study of your existing service, size the infrastructure for the chargers you need now and the ones you will add later, and design conduit runs so the second phase costs a fraction of the first.

The full project is quoted flat rate and in writing: utility coordination, permits, trenching and boring, panels and load management, charger mounting, and commissioning with your charging network.

What a charging project includes

  • Load study and utility service evaluation
  • Permits, plan review, and utility coordination
  • Trenching, boring, and conduit for current and future phases
  • Panels, feeders, and load management equipment
  • Level 2 and DC fast charger mounting and wiring
  • Commissioning, network activation, and documentation

Where we install

Workplace parking, retail centers, hotels, multifamily garages, dealerships, and fleet yards across San Antonio, Boerne, New Braunfels, Schertz, and the surrounding metro. Home charger installation lives with our residential EV service.

How it works

What are the steps to install commercial EV chargers?

There are four. A load study measures your service and panels. Design and quote set charger counts, locations, load management and phasing in one written flat rate. Install covers trenching, conduit, panels and charger mounting, scheduled around operations. Commissioning covers inspection, network activation and documentation handed to your team.

  1. 01

    Load study

    We measure your service and panels, and map what the site can support today.

  2. 02

    Design and quote

    Charger counts, locations, load management, and phasing in one written flat rate.

  3. 03

    Install

    Trenching, conduit, panels, and charger mounting, scheduled around operations.

  4. 04

    Commission

    Inspection, network activation, and documentation handed to your team.

Planning chargers? Start with the load study.

Request a quote

FAQ

What do businesses ask about commercial EV charging?

Straight answers. If you do not see yours, call us and ask.

Does our building have enough power for chargers?

That is what the load study answers. We measure your existing service and panel capacity, then design around it, using load management where the service is tight instead of forcing an expensive service upgrade.

Level 2 or DC fast charging?

Level 2 fits workplaces, multifamily, and anywhere vehicles park for hours. DC fast charging fits retail and fleet turnaround. Most sites mix both, and the quote lays out the tradeoffs.

Can we add more chargers later?

Yes, and cheaply, if phase one is designed for it. We oversize conduit and reserve panel capacity so phase two is mostly mounting and wiring, not trenching.

Do you handle utility coordination and permits?

Yes. Utility applications, permits, inspections, and commissioning with your charging network are all included in the flat rate quote.

Who installs commercial EV chargers in San Antonio?

Wattsmith Electric installs commercial EV charging for workplaces, retail, multifamily properties and fleets across the San Antonio metro under Texas contractor license TECL 41806. Each project runs from the load study and utility coordination through permits, charger mounting and commissioning with your charging network, quoted flat rate in writing.

How should fleet and workplace EV charging be designed?

Fleet yards and employee parking need charging that matches duty cycles and panel capacity. Load management stretches the existing service where it is tight, instead of forcing a service upgrade, and phased conduit design keeps expansion affordable, so a later phase is mostly mounting and wiring rather than trenching.

Which counties does Wattsmith serve for commercial EV charging?

We install commercial charging across Bexar, Comal, Guadalupe, Kendall, Wilson, Medina and Atascosa counties, including San Antonio, Boerne, New Braunfels and Schertz. Call (210) 446-5446 and ask for a commercial estimator. Every project starts with a load study of your existing service and panels.

What does CPS Energy ask for when a charging project needs new service?

A Commercial Building Application in its Construction and Renovation Web Portal with a load sheet, one-line diagram and sealed utility site plan attached. Under 300 kVA is Small Commercial, usually on overhead transformers; 300 kVA or more is Large Commercial on a pad-mounted transformer. After the City.s inspection release, CPS Energy allows 10 business days to set the meter.