Dedicated circuits for the racks
Each rack's power distribution units need their own circuits at the voltage and receptacle type on the equipment sheets. Circuits are labeled at both ends so a technician can trace any rack back to its breaker without guessing. Where racks are fed from two sources, the two paths are kept separate all the way back.
- Rack circuits to the PDU specifications
- Labels at the breaker and at the rack
- Separate A and B feeds where the design calls for them