
Service
Electrical Inspection in San Antonio
A clear read on what is safe, what is not, and what it takes to fix it.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Same day
Appointments available
Flat rate
Approved before work begins
TECL 41806
Licensed and insured
8am to 8pm
Open every day
Electrical emergency? Sparks, burning smell, or a dead panel: call (210) 446-5446 now
Emergency service$49 Off
Your First Service Call
New customers take $49 off their first diagnostic or service call with Wattsmith Electric.
New residential customers only. One per household. Valid on your first service call only. Not combinable with other offers. No cash value. Mention this offer when you book.
Our service guarantees
- We hit your window. Miss it with no heads-up, and that is $149 off.
- You approve one flat price before we touch a wire. No hourly meter.
- We protect your floors, haul our mess, and leave the space clean.
- Everything meets code and we stand behind it, or we come back and fix it.
Wattsmith Electric works to the 2023 National Electrical Code and pulls the permit where one is required. How we handle permits, inspections and the workmanship guarantee is on our standards page. The license, the coverage in force and our federal registrations, including the certificate of insurance process for contractors, are on insurance and licensing.
Why it does not pay to wait
What you cannot see in the panel and behind the walls is exactly what starts fires and fails insurance and sale inspections. Skipping the inspection does not remove the problem. It just means you find out at the worst possible time.
Real estate electrical inspection
Real estate electrical inspection, $563
Labeled photos, a priority action plan, and a report signed by a Texas licensed master electrician.
For home buyers, sellers and real estate agents.
Starting price. Your tech confirms the final number on site before any work.
See the real estate inspection offerBuying an older home, selling one, or just want to know what you are sitting on. An electrical inspection tells you the truth about the panel, the wiring, the grounding, and the devices, in plain language, not a scary list you cannot read.
We inspect the system, document what we find with photos, and hand you a prioritized report. Safety items first, code items next, nice-to-haves last. You get a straight answer and, if you want, a flat-rate quote to fix what matters.
What an electrical inspection in San Antonio covers
- Panel, breaker, and service inspection
- Grounding and bonding verification
- Outlet, GFCI, and AFCI testing
- Wiring type and condition assessment
- Buyer and seller pre-sale inspections
- Prioritized written report with photos
Electrical inspections for home buyers
A general home inspection walks the electrical system along with everything else. Ours is the electrical system alone, by a licensed electrician: the service, the panel, grounding and bonding, the wiring type, the receptacles tested for GFCI protection and polarity, and the smoke and CO alarm coverage.
Every finding is rated Safety, Repair or Maintenance, with a flat price for any correction, so you know what the electrical will cost before your option period ends.
Electrical inspections for home sellers
Find what a buyer's inspector will flag before the listing goes live. Correct it on your schedule at a flat price, or list the home with a written report already in hand.
Electrical inspections for real estate agents
When a general inspection says to have the electrical evaluated by a licensed electrician, our report is that evaluation: numbered findings with labeled photos, a priority action plan, and a flat price for each correction your client can negotiate with.
The report goes to your client as a link and a PDF, signed by a Texas licensed master electrician.
What the report looks like
This is the layout of a real report, with the customer's details replaced by sample data. Every finding is rated, numbered and planned, most urgent first.
Prepared for SAMPLE CUSTOMER, SAMPLE ADDRESS, San Antonio, TX
- 3Findings
- 1Safety
- 1Repair
- 1Maintenance
- 1. Service and main panel, SafetyTwo conductors on one breaker terminal (double tap) at breaker 14.Recommendation: Add a breaker or a listed tandem so each conductor has its own terminal.
- 2. Receptacles, RepairNo GFCI protection at the kitchen counter receptacles.Recommendation: Install GFCI protection on the kitchen counter circuit.
- 3. Smoke and CO alarms, MaintenanceHall smoke alarm is chirping; the date on it is 2014.Recommendation: Replace the alarm. Alarms are replaced every 10 years.
What you can check yourself first
Before you call, here is what you can safely check on your own. Even if you still call us, you will walk in knowing more than you did.
- Gather what you know: the home's age, any past electrical work, the panel brand.
- Note anything that already worries you: warm spots, flickers, tripping breakers.
- If this is a pre-sale, pull any prior inspection reports you have.
- Snap a photo of the panel so we can prep before we arrive.
Straight pricing
Inspections are a flat fee with a written report. Any repairs we recommend come with their own flat quote, no pressure.
- Up to three options on a job, each a real way to do it, priced flat. You choose the scope.
- Estimates are free. Troubleshooting is charged as its own line.
- The price you approve is the price you pay.
Book your electrical inspection
Flat-rate quote before any work starts. A Wattsmith electrician calls you back within 15 minutes during business hours.
Where we work
Electrical Inspections across the San Antonio metro
We bring electrical inspections to San Antonio and the surrounding communities. Find your area below or call and we will confirm we cover you.
- Electrical Inspections, Alamo Heights
- Electrical Inspections, Stone Oak
- Electrical Inspections, Helotes
- Electrical Inspections, Schertz
- Electrical Inspections, Converse
- Electrical Inspections, Universal City
- Electrical Inspections, Leon Valley
- Electrical Inspections, Boerne
- Electrical Inspections, New Braunfels
- Electrical Inspections, Cibolo
We do electrical inspections across the rest of the metro too, including Live Oak, Selma, Timberwood Park, Hollywood Park, Castle Hills, Windcrest, Kirby, Alamo Ranch, Westover Hills, Medical Center, Bulverde, Fair Oaks Ranch, Terrell Hills, Olmos Park, Shavano Park, Garden Ridge, Spring Branch, Canyon Lake, Seguin, Marion, Saint Hedwig, Adkins, La Vernia, Elmendorf, China Grove, Von Ormy, Somerset, Lytle, Castroville and Floresville.
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Electrical Inspections questions
Straight answers. If you do not see yours, call us and ask.
What do you check in an electrical inspection?
The service and panel, grounding and bonding, wiring type and condition, and the devices throughout. We test GFCI and AFCI protection and document everything with photos in a written report.
Should I get an inspection before buying a home?
If the home is older or the general inspector flagged the electrical, yes. A dedicated electrical inspection tells you what the repairs will actually cost before you close, not after.
Do I have to fix everything you find?
No. We rank findings by real risk. Safety items we recommend you address. Code and cosmetic items are your call. We give you the facts and a flat quote, and you decide.
What is in the report?
Every item we check is rated Safety, Repair, Maintenance, Pass or Not present. Findings carry labeled photos and go into a priority action plan, most urgent first, with a flat price for any correction.
Who signs the report?
A Texas licensed master electrician reviews and signs every report.
Is this the same as a general home inspection?
No. It covers electrical items only, and it does not replace a general home inspection.
Keep exploring
Related work and guides
Related services
Helpful guides
- Foundation Inspection Before Buying a House, and the Electrical Inspection That Goes With It
- Electrical Inspection Report Explained: How to Read It and Use It Before Closing
- Home Inspection vs Electrical Inspection: What Each One Covers and When You Need Both
- Questions to Ask an Electrician Before Buying a House in San Antonio
- How Long Does an Electrical Inspection Take, and What to Expect on the Day
Need electrical inspections done right?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked