Skip to content
Wattsmith Electric

EV Charger Installation | Kendall County

EV Charger Installation in Boerne, TX

Level 2 charging done right, sized to your panel and your car. Serving Boerne and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Boerne homeowners call Wattsmith Electric for ev charger installation. We find what others miss, price it flat, and do the work right the first time. Dependable from the first call.

Boerne is ranch country. Long service runs, well and septic pumps, gates, barns, and shops. We plan power across the whole property, set sub-panels where they belong, and back it all with generator options for when the grid drops.

You get one flat number for your Boerne project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.

What ev charger installation in Boerne includes

  • Level 2 240 volt charger installation, plug-in or hardwired
  • Dedicated circuit sized to the charger and the car
  • Load calculation to confirm panel capacity
  • Panel or sub-panel upgrade when capacity is short
  • Clean conduit runs across the garage or exterior
  • Permit and inspection where required

Can my Boerne panel handle a Level 2 EV charger?

Often it can, because most Boerne homes are fairly new. Census estimates put the median home in the city at 2006, and about two in three were built in 2000 or later, so many panels already have room for one more 240 volt circuit. We still run a load calculation before we promise it.

The charger circuit is installed and inspected to the 2023 National Electrical Code, the edition Boerne enforces, by a contractor registered with the city. When the calculation says the panel is full, the next step is a service increase through whichever utility serves the house.

Rates depend on that utility. The City of Boerne's rates page names only residential and commercial classes and shows no separate EV rate. Bandera Electric Cooperative, which serves parts of the city limits, offers time-based usage rates for EVs and recommends charging off peak.

Straight pricing

Free estimate. We come look at the panel location, the charger, and the run, and give you a fixed price before anything starts.

FAQ

EV Charger Installation in Boerne, answered

Straight answers. If you do not see yours, call us and ask.

How fast will it charge?

A properly sized Level 2 circuit adds roughly 25 to 40 miles of range per hour depending on your car and charger. That is overnight full from empty for most drivers.

Do you offer emergency electrical service in Boerne?

We keep room for urgent calls in Boerne. If you have a burning smell, a dead panel, or a real safety issue, call us and we will get to you as fast as we safely can.

Do you charge extra to come out to Boerne?

No trip-charge games. Boerne is inside our service area, so you get straight flat-rate pricing on the work itself, quoted before we start.

EV Charger Installation in Boerne, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote