Skip to content
Wattsmith Electric

Electrical Inspections | Kendall County

Electrical Inspections in Boerne, TX

A clear read on what is safe, what is not, and what it takes to fix it. Serving Boerne and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Need electrical inspections in Boerne? Wattsmith Electric quotes the number before we start, then does the work to code. Flat-rate pricing, no hourly meter.

Boerne is ranch country. Long service runs, well and septic pumps, gates, barns, and shops. We plan power across the whole property, set sub-panels where they belong, and back it all with generator options for when the grid drops.

From the first call to the final walkthrough, your electrical inspections in Boerne is handled by licensed, insured, background-checked techs who treat your home like their own.

What electrical inspections in Boerne includes

  • Panel, breaker, and service inspection
  • Grounding and bonding verification
  • Outlet, GFCI, and AFCI testing
  • Wiring type and condition assessment
  • Buyer and seller pre-sale inspections
  • Prioritized written report with photos

What does a home electrical inspection in Boerne look at?

That depends on the house's age, and Boerne's housing spans a wide range. By Census estimates, roughly two in three homes were built in 2000 or later, while about one in seven predates 1980. A newer house gets checked for panel condition, breaker sizing, GFCI and AFCI protection and workmanship; an older one adds grounding, wire type and insulation.

We compare what we find with the 2023 National Electrical Code that Boerne has adopted, and we say which items were allowed when the house was built and which are real hazards now.

We also look at the meter. In the city's electric area, its specifications keep a meter at least three feet from any natural gas meter or pressure regulator, and a meter loop that does not meet city standards will not be connected. The report notes who supplies your power, the city or a cooperative, because that decides who handles any meter work.

Straight pricing

Inspections are a flat fee with a written report. Any repairs we recommend come with their own flat quote, no pressure.

FAQ

Electrical Inspections in Boerne, answered

Straight answers. If you do not see yours, call us and ask.

Do I have to fix everything you find?

No. We rank findings by real risk. Safety items we recommend you address. Code and cosmetic items are your call. We give you the facts and a flat quote, and you decide.

Is this the same as a general home inspection?

No. It covers electrical items only, and it does not replace a general home inspection.

Do you charge extra to come out to Boerne?

No trip-charge games. Boerne is inside our service area, so you get straight flat-rate pricing on the work itself, quoted before we start.

Do you offer emergency electrical service in Boerne?

We keep room for urgent calls in Boerne. If you have a burning smell, a dead panel, or a real safety issue, call us and we will get to you as fast as we safely can.

Electrical Inspections in Boerne, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote