EV Charger Installation | Guadalupe County
EV Charger Installation in Schertz, TX
Level 2 charging done right, sized to your panel and your car. Serving Schertz and the San Antonio metro.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Wattsmith Electric handles ev charger installation in Schertz with no guessing and no surprise invoices. Honest flat-rate work from a crew that shows up squared away.
Schertz keeps growing, and it is a mix. New construction that needs EV and generator prep, and older homes near the base that need panels and rewires. We cover both ends of that spread with the same flat-rate honesty.
You get one flat number for your Schertz project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.
What ev charger installation in Schertz includes
- Level 2 240 volt charger installation, plug-in or hardwired
- Dedicated circuit sized to the charger and the car
- Load calculation to confirm panel capacity
- Panel or sub-panel upgrade when capacity is short
- Clean conduit runs across the garage or exterior
- Permit and inspection where required
Can I get a utility rebate on a Level 2 EV charger in Schertz?
If GVEC supplies your power, it offers members a rebate on a new Level 2 charger installed by a licensed electrician, paid as a credit on your electric bill. The charger has to be UL, ETL or cETL listed, only certain brands qualify, and GVEC asks for the permit and passed inspection report when one is required.
The city side fits that paperwork. Schertz requires a permit for new permanent wiring, and applications filed on or after September 1, 2026 are held to the 2026 National Electrical Code. GVEC's rebate page still cites NEC 2020, so we build to the edition the city enforces and hand you the inspection report for your application. GVEC allows one rebate per service location and can change the program without notice, so read the current terms before you buy the charger.
If CPS Energy or New Braunfels Utilities serves your address instead, we check that utility's own rules. Your car's charging rate and the room left in your panel set the circuit size.
Straight pricing
Free estimate. We come look at the panel location, the charger, and the run, and give you a fixed price before anything starts.
Nearby
EV Charger Installation in other areas
More in Schertz
Other services in Schertz
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
EV Charger Installation in Schertz, answered
Straight answers. If you do not see yours, call us and ask.
How fast will it charge?
A properly sized Level 2 circuit adds roughly 25 to 40 miles of range per hour depending on your car and charger. That is overnight full from empty for most drivers.
Do you offer emergency electrical service in Schertz?
We keep room for urgent calls in Schertz. If you have a burning smell, a dead panel, or a real safety issue, call us and we will get to you as fast as we safely can.
Do you charge extra to come out to Schertz?
No trip-charge games. Schertz is inside our service area, so you get straight flat-rate pricing on the work itself, quoted before we start.
EV Charger Installation in Schertz, quoted flat
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked