Skip to content
Wattsmith Electric

Surge Protection | Guadalupe County

Surge Protection in Cibolo, TX

Stop the spikes at the panel before they reach your electronics. Serving Cibolo and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Wattsmith Electric handles surge protection in Cibolo with no guessing and no surprise invoices. Honest flat-rate work from a crew that shows up squared away.

Cibolo filled up fast with newer family homes, and those families are adding EV chargers, hot tubs, and generators. We size the panel for it, wire it clean, and make sure the additions do not overload what the builder installed.

You get one flat number for your Cibolo project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.

What surge protection in Cibolo includes

  • Type 2 whole-home surge protective device at the panel
  • Point-of-use protection for sensitive equipment
  • Proper grounding and bonding verification
  • Coordination with a panel upgrade when needed
  • Status indicator so you know it is still protecting

Why put whole house surge protection on a Cibolo panel?

Because surges reach a house from the grid and from inside it, and a device at the panel meets them where power enters. GVEC's own guidance says a surge happens when the flow of electricity is interrupted and then started again, and that it can reach thousands of volts if lightning strikes a transformer.

Interruptions are a fact of life in this county. FEMA lists Guadalupe County in the February 2021 winter storm declaration, DR-4586, and in storm and flood declarations from 2024 and 2025. Every restoration after an outage is a restart, which is when electronics and appliance boards take the hit. Cibolo works from the 2023 National Electrical Code, and that edition calls for surge protection when a dwelling service is replaced, so a panel upgrade brings the device along. If your panel is staying, we add the device to it and check the grounding and bonding it depends on.

Straight pricing

Surge protection is a flat-rate install. Bundle it with a panel upgrade and it goes in while the panel is open.

FAQ

Surge Protection in Cibolo, answered

Straight answers. If you do not see yours, call us and ask.

Do I still need power strips?

A layered approach is best. The panel device handles the big spikes. Point-of-use protection adds a second layer for sensitive gear like computers and media. We can set up both.

How fast can you get to Cibolo?

For most calls in Cibolo we can offer same-day or next-day service during business hours. Call and we will give you the soonest honest window.

Can you handle both my home and my rental in Cibolo?

Absolutely. We work with homeowners and landlords across Cibolo, from a single repair to a full panel upgrade or a turn between tenants.

Surge Protection in Cibolo, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote