Skip to content
Wattsmith Electric

EV Charger Installation | Bexar County

EV Charger Installation in Alamo Heights, TX

Level 2 charging done right, sized to your panel and your car. Serving Alamo Heights and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Wattsmith Electric handles ev charger installation in Alamo Heights with no guessing and no surprise invoices. Honest flat-rate work from a crew that shows up squared away.

Alamo Heights is full of homes built to last, and a lot of them still run on original panels and ungrounded circuits. That charm comes with old wiring, and old wiring is where we do some of our best work. Panel upgrades, grounding, and careful rewires that respect the house.

You get one flat number for your Alamo Heights project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.

What ev charger installation in Alamo Heights includes

  • Level 2 240 volt charger installation, plug-in or hardwired
  • Dedicated circuit sized to the charger and the car
  • Load calculation to confirm panel capacity
  • Panel or sub-panel upgrade when capacity is short
  • Clean conduit runs across the garage or exterior
  • Permit and inspection where required

Can CPS Energy help with charging an EV at my Alamo Heights home?

Yes, through rewards rather than an installation program. CPS Energy, which serves Alamo Heights, runs two EV Rewards programs for home charging. EV Smart Rewards lets the utility shift your charging to low demand times if you have a qualifying car or charger, and EV Off-Peak Rewards pays you for charging outside its peak hours. Both pay out as bill credits.

CPS Energy's charging page says a licensed electrician should install home charging equipment. Alamo Heights requires permits for alterations to existing buildings and has adopted the 2020 National Electrical Code, so we design the circuit to that edition and handle the permit when your job calls for one.

In a house built before 1950, which describes about half the city by Census estimates, the first question is whether your service has room for a new 240 volt circuit. We run a load calculation before we quote.

Straight pricing

Free estimate. We come look at the panel location, the charger, and the run, and give you a fixed price before anything starts.

FAQ

EV Charger Installation in Alamo Heights, answered

Straight answers. If you do not see yours, call us and ask.

How fast will it charge?

A properly sized Level 2 circuit adds roughly 25 to 40 miles of range per hour depending on your car and charger. That is overnight full from empty for most drivers.

Do you offer emergency electrical service in Alamo Heights?

We keep room for urgent calls in Alamo Heights. If you have a burning smell, a dead panel, or a real safety issue, call us and we will get to you as fast as we safely can.

Do you charge extra to come out to Alamo Heights?

No trip-charge games. Alamo Heights is inside our service area, so you get straight flat-rate pricing on the work itself, quoted before we start.

EV Charger Installation in Alamo Heights, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote