Key takeaways
- A burning smell, sparks, a hot outlet or panel, water near electrical equipment or a downed line is an emergency.
- A downed or sparking utility line is the utility's and 911's, not an electrician's. Stay away from it.
- A dead circuit with no heat, smell or sparks is usually safe to leave off until a scheduled visit.
Knowing what counts as an electrical emergency saves both money and risk. Calling an emergency electrician for a dead outlet costs more than it needs to. Waiting on a hot panel can cost a house. Here is the line between the two.
What counts as an electrical emergency?
- A burning or fishy plastic smell from an outlet, switch, fixture or the panel.
- Sparks or arcing, or the sound of crackling or buzzing in a wall or the panel.
- An outlet, switch plate or panel cover that is hot to the touch.
- Water in contact with electrical equipment: a flooded panel, a leak into a light or outlet.
- A breaker that trips again the moment it is reset, with a smell or heat.
- Smoke from anything electrical.
What should I do first?
If there is smoke or fire, get everyone out and call 911. Do not stay to fight an electrical fire with water.
If there is heat, a smell or sparks and no fire, turn off the breaker for that circuit if you can reach the panel safely and dry-handed. If you cannot tell which breaker, and the panel itself is not the problem, turn off the main. Then call an electrician. Do not turn it back on to test it.
If there is water near the panel, do not touch the panel. Stay out of standing water and call.
Is a downed power line an electrician's job?
No. A line down in the yard or the street belongs to the utility. Stay well away from it and anything it touches, keep others away, and call 911 and the utility. In most of San Antonio that is CPS Energy, the city-owned utility. An electrician comes in after, if the service mast or meter on your house was damaged.
What can usually wait for a visit?
- A single dead outlet or light with no heat, smell or scorch marks.
- A breaker that tripped once and held when reset.
- A GFCI outlet that trips now and then in a wet area.
- Lights that flicker when a big appliance starts, with nothing else going on.
Those still deserve attention, and a diagnostic visit is how they get sorted. They just do not need someone at midnight.
What about the whole house going dark?
First, look outside. If the neighbors are dark too, it is an outage, and the utility's outage line is the call. If only your house is out, check the main breaker. If the main has not tripped and the neighbors have power, the problem is between the utility and your panel, and that is a call to the utility first and then to us.
Homes that cannot be without power, for medical equipment or work, are where a standby generator earns its place. Our guide to a Generac install, start to finish covers that.
Who should I call?
For heat, smell, sparks or water at electrical equipment in San Antonio, call our emergency electrician line. For anything that can wait, book electrical repair and we will find the cause.