Skip to content
Wattsmith Electric

Houston standby power for business

Commercial standby generator Houston for the next storm and the next freeze

Houston businesses have lost power to a hurricane, a derecho and a statewide freeze in the last few years. A standby generator with an automatic transfer switch carries the loads you choose through the next one. We size it with you on site and quote it in writing for free.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Houston standby power

Why do Houston businesses plan for commercial standby power?

Recent history. Hurricane Beryl left more than 2.26 million CenterPoint customers without power at its peak in July 2024, the May 2024 derecho brought winds over 100 mph through the metro, and Winter Storm Uri took out 48.6% of the generation on the Texas grid in February 2021.

Hurricane Beryl, July 2024

Beryl came ashore near Matagorda as a Category 1 hurricane at 4 am on July 8, 2024. CenterPoint reported more than 2.26 million customers out at the peak and brought in about 10,000 frontline resources from other utilities to add to its own 1,500.

The May 2024 derecho

On May 16, 2024 the National Weather Service tracked a swath of winds over 100 mph down through the Houston metro. Four days later CenterPoint had restored more than 770,000 customers, about 85% of those affected.

Winter Storm Uri, February 2021

ERCOT told Congress that at its worst the storm took out 48.6% of the generation available to the Texas grid, and its own report puts the most unavailable capacity at 52,037 MW on the morning of February 16, 2021. That outage was statewide, not a Houston line down.

What we install

The generator, its automatic transfer switch, and the wiring that splits the loads you keep from the ones you drop. CenterPoint keeps a Transfer Switch portal for these requests, and the work goes in under a City of Houston electrical permit.

  • Generator sized to the loads you choose
  • Automatic transfer switch
  • Load separation and labels
  • City permit and CenterPoint transfer switch request

Choosing what stays on

Coolers, servers, phones, security, a few lights and a restroom are the usual list. We walk the building with you, write down what has to run, and size the unit from that list rather than from the whole building.

Questions about commercial standby generator installation in houston? Call or get a quote.

Free Houston estimate

How do I get a standby generator estimate for a Houston business?

Give the address, the business and the loads you cannot lose in an outage. We answer the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do Houston businesses ask about standby generators?

Straight answers. If you do not see yours, call us and ask.

What does a commercial standby generator cost in Houston?

The price is set at the free site visit, from the loads you choose, the transfer switch and the gas or fuel supply, and you get it in writing.

Who supplies the gas line and the pad?

We tell you in the written estimate which parts we do and which go to a plumber or a concrete contractor, so nothing is left unassigned.

Call NowGet a Quote