Skip to content
Wattsmith Electric

Houston warehouse and plant power

Industrial electrician Houston for warehouses and plants

Port Houston calls itself the nation's largest port for waterborne tonnage, and the warehouses and plants along the Ship Channel run conveyors, compressors, docks and cranes. We wire the power, controls and equipment hookups, and quote each job in writing for free.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Houston industrial work

What industrial electrical work do Houston warehouses and plants need?

Three phase feeders and panels, motor controls, dock and conveyor power, and drops for new machines. Along the Ship Channel, which Port Houston says has more than 200 private and eight public terminals, large loads also meet CenterPoint billing rules, such as the 80% demand ratchet for plants served at primary voltage.

The port economy

Port Houston runs eight public terminals on the 52 mile Ship Channel, and the channel complex adds more than 200 private ones. Port Houston credits the channel with 1.89 million Texas jobs. Behind the terminals are distribution warehouses, cold storage and plants.

Power for the floor

Three phase feeders and panels, motor control and starters, dock levelers and door operators, and drops for new machines. When a line moves or a machine is added, we work from the equipment data and the space's existing load.

  • Three phase feeders and panels
  • Motor controls and starters
  • Dock, door and conveyor power
  • Machine moves and new drops

Large loads and CenterPoint billing

A plant served from CenterPoint feeders at primary voltage is billed on the higher of this month's peak or 80% of its highest peak over the last eleven months. So starting a big new motor load once can raise the bill for most of a year, and we plan start sequences with that in mind.

Underground runs and the first inspection

Houston's commercial inspection order starts with ditch cover, booked when underground conduit is in, then rough-in, any temporary cut-in, and the meter loop and final. Yard lighting, gate power and runs between buildings all start at the ditch.

  • Ditch cover
  • Rough-in
  • Temporary cut-in when needed
  • Meter loop and final

Labels and lockout

We install the arc flash warning labels the code calls for and work under lockout with your maintenance team. We do not perform arc flash studies; a detailed label comes from an engineer's study, and we work from it when you have one.

Questions about warehouse and industrial electrical work in houston? Call or get a quote.

Ships and barges on the Houston Ship Channel with industrial plants along the bank
Houston Ship Channel Traffic by Patrick Feller, CC BY 2.0, via Wikimedia Commons, cropped. A city scene, not our work.

Free Houston estimate

How do I get an industrial electrical estimate in Houston?

Give the address, the equipment and the hours the floor runs. We answer the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do Houston plant and warehouse managers ask?

Straight answers. If you do not see yours, call us and ask.

Do you work inside plants on the Ship Channel?

Yes, for power, controls and equipment hookups, under the site's own safety rules and orientation.

Can work happen during a shutdown?

Yes. We plan crews and material to the shutdown window and list in the estimate what is done in it.

Call NowGet a Quote