Skip to content
Wattsmith Electric

Houston tenant finish-out wiring

Tenant build-out electrical contractor Houston from plan review to the final

A Houston suite cannot open until its electrical work passes the city, and the city reviews it in a set order. We price the build-out from your plans, take it through review and inspections, and plan each trip from San Antonio around the inspection the space is ready for.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Houston build-outs

How does a Houston tenant build-out get its electrical approval?

Plans and load calculations go to the Houston Permitting Center through ProjectDox, where electrical is one of the review disciplines. The electrical permit is bought after the building permit, the wiring is inspected before walls and ceilings close, and after the final the city releases the suite to CenterPoint for power.

Plans first, and sometimes an engineer's seal

Houston's code asks for plans and calculations with the permit application, and the building official may require them sealed by a Texas professional engineer. Electrical is one of the review disciplines the Permitting Center assigns from the scope of work, and the drawings are uploaded through ProjectDox.

  • Lighting, power and panel schedules
  • Load calculations for the suite
  • Engineer's seal where the building official asks for one

The trade permit follows the building permit

On a commercial job the city sells trade permits only after the building permit is sold, so the electrical permit waits on the general contractor's permit. The master electrician who buys it must hold a TDLR license and be registered with the City of Houston.

Wall and ceiling cover inspections

Wiring meant to be hidden cannot be covered until an inspector has seen it, so drywall and ceiling grid wait on the wall cover and ceiling cover inspections. The Electrical Inspections section aims to inspect within three working days of a request, and we book each one as soon as the stage is ready.

  • Wall cover inspection before drywall
  • Ceiling cover inspection before the grid closes
  • Inspections booked online or by the city's IVR line

Medical suites and the rest of Houston's spaces

Clinic and medical office suites carry dedicated equipment circuits and more receptacles than a plain office, and Houston has a lot of them: the Texas Medical Center alone counts 54 million developed square feet. We also wire restaurants, retail bays and office floors, each priced from its own plans.

  • Medical and dental suites
  • Restaurants and retail bays
  • Office floors and conversions

The final and the power to the space

After the final inspection the city releases the space to CenterPoint, and CenterPoint connects only when that approval reaches its Permit Desk. If the suite needs its own meter, we put the CenterPoint request in early so the meter is not the last thing holding up the opening.

Questions about tenant build-out electrical work in houston? Call or get a quote.

Free Houston estimate

How do I get a price on a Houston tenant build-out?

Give the address, the square footage and the opening date, and attach or describe the plans. We answer the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do tenants and general contractors ask about Houston build-out wiring?

Straight answers. If you do not see yours, call us and ask.

Who buys the electrical permit for a Houston build-out?

The electrical contractor's registered master electrician buys it in iPermits, after the building permit for the job is sold.

Can the walls close before the electrical inspection?

No. Houston's code says wiring meant to be concealed is not covered until it is inspected and approved.

Do you work with the general contractor's schedule?

Yes. We set our trips by inspection stage and tell the general contractor which stage each visit finishes.

Call NowGet a Quote