Skip to content
Wattsmith Electric

Houston new homes, for builders

New construction electrician Houston for production and custom builders

We wire new homes for Houston builders, from the saw pole to the final. Service calls, repairs and remodels on existing homes stay in the San Antonio area only.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Houston new homes

How does a new Houston home get its electrical service?

In stages. A permitted saw pole powers the build, a Temporary Cut-In permit brings temporary power to the house, and the registered contractor schedules each trade inspection with the plans on site. Builders request ESI IDs from CenterPoint online, and underground subdivisions run through CenterPoint's Joint Trench portal.

Saw pole, then temporary cut-in

In Houston a temporary saw pole needs its own electrical permit, and the city's code sets its minimum build: a 60 ampere switch or breaker panel and a grounded receptacle on at least a four by four timber. Later, a Temporary Cut-In permit brings temporary power to the house to check the wiring.

  • Saw pole permit
  • Temporary cut-in permit, valid 180 days

ESI IDs for the lots

CenterPoint has home builders request ESI IDs online, and multifamily builders send a request for several at once. We get the ESI ID moving at rough-in, so the meter is not what holds the closing.

Underground subdivisions

Underground residential subdivisions run through CenterPoint's Joint Trench portal, where the developer's trench work is managed from start to finish. In those areas temporary service is offered only next to energized transformers or junction boxes, so the temporary meter pole goes where CenterPoint allows.

Rough-in, trim-out and the final

Houston's new residential permit keeps the plans and permit on site for every inspection, and the registered licensed contractor schedules each trade inspection. We run rough-in to the builder's schedule, trim out after paint, and set the service entrance for the meter.

  • Whole-house rough-in
  • Trim-out of devices and fixtures
  • Service entrance and meter base

Questions about new-construction residential wiring for houston home builders? Call or get a quote.

Free Houston estimate

How does a Houston builder get a price on new homes?

Give the builder, the subdivision or lots, the plan count and the start date. We answer the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do Houston home builders ask before hiring an electrician?

Straight answers. If you do not see yours, call us and ask.

Do you work for production builders and custom builders?

Both, on plans you send us, with a written price per plan.

What other residential work do you do in Houston?

None. In Houston we wire new homes for builders only. Service calls, repairs and remodels on existing homes stay in the San Antonio area only.

Call NowGet a Quote