Commercial service upgrade Houston with CenterPoint and the city lined up

A bigger service in Houston is two projects at once: our side, the switchgear, panels and feeders the city inspects, and CenterPoint's side, the transformer, the drop and the meter. We plan both, so the new gear is ready the day CenterPoint can connect it.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Houston service work

What does a commercial service upgrade in Houston take?

Two sets of work. CenterPoint issues the ESI ID, handles any transformer or drop through an Electric Service Request, and sets the meter. We install the switchgear and panels under a city permit with plan review. CenterPoint connects only after the city approves the installation and its Electrical Inspections section sends the release.

It starts with an ESI ID and a CenterPoint request

CenterPoint asks a commercial business owner or builder to call for an Electric Service Identifier, the ESI ID, and to file an online Electric Service Request when the job needs CenterPoint construction such as poles, wire or a transformer. CenterPoint says a local service consultant reaches out within two business days.

  • ESI ID by phone from CenterPoint
  • Electric Service Request online when CenterPoint builds
  • A CenterPoint consultant assigned to the job

What CenterPoint needs in the request

CenterPoint's tariff lists six things every construction request carries: a contact name, a phone number, the ESI ID if there is one, the service address with directions and access, the work asked for, and the date wanted. The tariff also says CenterPoint does not guarantee when that construction starts or finishes, so we file early.

Our side: gear, permit and plan review

The new switchgear or panels go in under a Houston electrical permit, and the city lists plan review as required for a circuit panel permit. The installation follows CenterPoint's own rule book for customers and electricians, its Service Standards, for where the meter and service equipment go.

  • Switchgear, main and distribution panels
  • Feeders and meter equipment
  • Plan review with the city

Inspection, release and the meter

CenterPoint will not connect the new service until the city approves the installation, and the city's Electrical Inspections section is the office that performs the utility release. Once the release is in, CenterPoint says meters are usually set within three to five business days of the requested date, weather and workload permitting.

Planning the cutover

Changing a service means a planned outage. We set the cutover with you and CenterPoint for the hours that cost the business least, have the new gear tested and labeled first, and keep the outage to the swap itself.

  • Cutover date set with you and CenterPoint
  • Gear tested and labeled before the outage
  • Arc flash warning labels on the new equipment

Questions about commercial service upgrades and switchgear in houston? Call or get a quote.

Free Houston estimate

How do I start a commercial service upgrade in Houston?

Give the address, the present service size if you know it, and what the new load is for. We answer the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do Houston businesses ask about a bigger electrical service?

Straight answers. If you do not see yours, call us and ask.

Do I call CenterPoint or my electricity provider for a bigger service?

CenterPoint. It owns the delivery system, sets the meter and builds any transformer or drop. Your retail provider bills the power.

How long does CenterPoint take to set a meter?

CenterPoint says meters are usually set within three to five business days of the requested start date, weather and workload permitting, after the city's approval reaches it.

Do you do arc flash studies?

No. We install the arc flash warning labels the code calls for. A detailed study comes from an engineer, and we work from it when you have one.