What the drawings must show
Fort Worth's commercial plans page asks the electrical sheets to locate the transformer, disconnects, meters and panels, give wire sizes with one-line diagrams, and carry enough detail to check the code. It also notes that state law calls for mechanical, electrical and plumbing plans sealed by a Texas professional engineer on buildings over 5,000 square feet.
- Transformer, disconnect, meter and panel locations
- One-line diagrams and wire sizes
- Engineer-sealed sheets on larger buildings