Skip to content
Wattsmith Electric

Fort Worth commercial lighting

LED lighting retrofit Fort Worth measured against your demand line

On Oncor's commercial schedule a building pays for its peak kilowatts as well as its energy, and lighting is often on through that peak. We convert fixtures to LED, count the kilowatts taken off, and give you a free written estimate built from your fixture list.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Fort Worth lighting work

Why does an LED retrofit change a Fort Worth commercial electric bill?

Oncor bills most commercial buildings on peak kW as well as energy. Above 10 kW, the distribution charge follows the heaviest fifteen minutes of the month, and for most larger loads an 80% ratchet holds a high peak for eleven more months. Lighting on during that peak counts, so LED fixtures cut both energy and demand.

Billed on the peak fifteen minutes

A building with demand above 10 kW at secondary voltage falls under Oncor's Secondary Service Greater Than 10 kW schedule, where NCP kW is the power drawn in the heaviest fifteen minute interval of the billing month. Once on that schedule, a premise stays there until it goes 12 billing months in a row without passing 10 kW.

The 80% ratchet and summer peaks

For most loads whose peak in the prior eleven months topped 20 kW, the distribution charge is billed on the higher of this month's peak or 80% of that eleven month high. Premises that have ever reached 700 kW are billed transmission on their average demand at ERCOT's four summer peaks of the year before. Less lighting load lowers both numbers.

Reading the demand on your bill

Oncor charges its delivery costs to your retail provider, which carries them onto your bill, and the PUC regulates Oncor's rates but not the retailer's price. Pull two or three recent bills before the retrofit so the kW line afterward can be checked against the same line before.

  • Two or three recent bills
  • Fixture counts and operating hours
  • Fixtures lit at the busiest hour

The fixtures, and the COMcheck sheet

Common Fort Worth jobs are warehouse high bays, office troffers, canopies, wall packs and lot poles, with controls added where the layout allows. Where the work is under a city permit, the electrical final has the inspector confirm the installed fixtures match the COMcheck sheet, so the fixture schedule and the order have to agree.

  • Warehouse high bays
  • Office troffers and downlights
  • Lot poles, canopies and wall packs
  • Sensors and lighting controls

Questions about led lighting retrofits in fort worth? Call or get a quote.

Free Fort Worth estimate

How do I get an LED retrofit estimate for a Fort Worth building?

Tell us the building type, a rough fixture count and the operating hours, and send a recent bill if you have one. You hear back the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do Fort Worth building owners ask about LED retrofits?

Straight answers. If you do not see yours, call us and ask.

Does an LED retrofit lower an Oncor demand charge?

It takes the lighting share off your peak kW. Whether the charge drops depends on what else runs in that busiest fifteen minutes and on the 80% ratchet, which your bill's demand line shows.

Can the fixture work happen after hours?

Yes. We schedule it around your operating hours, and the written estimate lists when each area will be finished.

Call NowGet a Quote