Skip to content
Wattsmith Electric

Fort Worth standby power for business

Commercial generator installation Fort Worth for the next freeze or storm

Since 2021 North Texas has had a freeze lasting nearly six days, an ice event, and a spring storm that Oncor counted in the hundreds of thousands of outages. A standby generator and automatic transfer switch keep the loads you pick running through the next one, and you get its price in writing, set at the free site visit.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Fort Worth standby power

What has pushed Fort Worth businesses toward commercial standby generators?

Three kinds of outage since 2021. In February 2021 DFW Airport spent 139 straight hours at or below freezing, the 2023 ice event brought reports of half an inch of ice, and after a May 2024 storm across DFW, Oncor's customer outage count passed 650,000.

February 2021

The National Weather Service in Fort Worth counted 139 hours in a row, from 5 pm on February 13 to noon on February 19, when DFW Airport never rose above freezing, and the thermometer there read minus 2 degrees on February 16. ERCOT later told Congress the storm took out 48.6% of the generation available to the grid at its worst.

The 2023 ice event

From January 30 to February 1, 2023, sleet and ice spread across North and Central Texas, the weather service received several reports of half an inch of ice, and the airport's count of hours at or below freezing reached 88. Ice on lines and limbs is exactly the outage a generator is bought for.

The May 2024 storm

When a storm system crossed DFW on May 28, 2024, Oncor's count of customer outages passed 650,000. Oncor had more than 340,000 customers back within a day and more than 400,000 by 4 p.m. on May 29, with over 7,500 personnel on the work.

What goes in

The generator, an automatic transfer switch, and the wiring that separates the circuits you keep from the ones you shed. Oncor's guidelines put the transfer switch on the load side of the meter base and never in series with the meter, and the whole installation is filed as a Fort Worth electrical permit.

  • Generator sized to the chosen loads
  • Automatic transfer switch on the load side of the meter
  • Separated and labeled circuits
  • City electrical permit

Deciding what keeps running

Refrigeration, network and phones, security, some lighting and a restroom usually make the list. We walk the building with you, write the list down, and size the unit to that list instead of to the whole service.

Questions about commercial standby generator installation in fort worth? Call or get a quote.

Free Fort Worth estimate

How does a Fort Worth business book a free generator site visit?

Tell us the address, the business and the loads an outage would cost you. You hear back the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

Which generator questions do Fort Worth owners raise first?

Straight answers. If you do not see yours, call us and ask.

What does a commercial standby generator cost in Fort Worth?

It depends on the loads you choose, the transfer switch and the fuel supply, so the figure is set at the free site visit and written down before anything is ordered.

Who handles the gas line and the concrete pad?

The written estimate names which parts we do and which go to a plumber or a concrete contractor, so every part has an owner.

Call NowGet a Quote