Key takeaways
- Fort Worth takes permit applications online through Accela Citizen Access, and electrical is one of the trade permits it lists there.
- On a commercial job the building permit must be issued before a trade permit, electrical included, can be applied for.
- The contractor needs a Fort Worth registration on file: a Texas electrical contractor license, insurance naming the City as additional insured, renewed every year.
- Fort Worth says it enforces the 2026 National Electrical Code from September 1, 2026, the same date the state code took effect.
- Power comes on after the city's electrical release; Oncor does not connect until the proper authority approves the installation.
A commercial electrical permit in Fort Worth comes after the building permit, not beside it. The city takes applications online through Accela Citizen Access, issues the building permit first, and only then accepts the trade permits, electrical among them. The contractor who pulls the electrical permit must have a current city registration on file, and the work is built and inspected to the 2026 National Electrical Code. This guide follows the steps in the order the City of Fort Worth describes them, from registration to the electrical release that lets the utility connect.
Where do you apply for a commercial electrical permit in Fort Worth?
You apply online through Accela Citizen Access, the city's permit portal. Fort Worth lists electrical among the trade permits that may be applied for there. The city also tells applicants to verify fees by logging into their Accela account before paying, because the portal shows what is due on that permit.
The same account carries the permit after it is issued. Inspections are requested through it, and the city asks that the inspection contact be filled out in the online profile for every scheduled inspection. Setting up the account with the right names before the first submittal is part of the job, not an afterthought, because the account is how the city reaches the people on site.
Sources: the city's Development Services permits page, the Accela Citizen Access portal, and the Fort Worth inspections page.
Why must the building permit be issued before the electrical permit?
Because the city sets that order in plain words: on a commercial job, the building permit must be obtained and issued before a trade permit can be applied for. The building permit carries the plan review for the project, so the electrical permit waits until that review is finished and the building permit is issued.
In practice the electrical scope is settled during building plan review, not after it. The electrical drawings travel with the building set, the reviewers comment on them there, and the answers go back through the building permit. Once it is issued, the electrical contractor applies for the electrical permit against it, and electrical work waits for that permit.
Source: the city's commercial permits page.
What do commercial plans need to show for the electrical work?
Fort Worth's commercial plans page asks electrical plans to show transformer, disconnect, meter and panel locations, wire sizes and locations on one-line diagrams, and enough information to judge compliance with the electrical code. For buildings over 5,000 square feet, the city says state law requires the electrical plans to be sealed by a Texas Professional Engineer.
Those items line up with what the field crew needs as well. A one-line diagram that shows the service, the distribution and the panel feeds tells the inspector what to expect and tells us what to build. When a build-out adds load to an existing service, the panel schedules and the load figures on the drawings are what show the service can carry it. On a sealed set, we build to the engineer's drawings and raise questions through the engineer, not around the drawings.
Source: the city's commercial building plans page.
How long does Fort Worth take to review a commercial permit?
The city's stated standard is 7 business days for first review comments on a complete commercial permit application. Fort Worth also has an X Team that offers expedited building permit review, with full plan review comments in 5 business days, for an hourly review fee the city sets in its Commercial Development Guide.
The word that matters is complete. The clock in the review standard starts on a complete application, so missing plan items or an unregistered contractor push the start back. First review comments are also just that: comments. A set that comes back with questions goes through another round, which is why the electrical drawings are worth checking against the city's list before the set is submitted.
Sources: the city's review timeframes page and the 2025 Commercial Development Guide, page 34.
Who can pull a commercial electrical permit in Fort Worth?
A contractor with a valid Fort Worth registration on file. For electrical work that means a Texas electrical contractor license, a certificate of liability insurance that names the City of Fort Worth as an additional insured, and a registration that expires one year from issuance. The city's development guide says registration comes before the permit is issued.
The state license comes first. The Texas Department of Licensing and Regulation says anyone who performs electrical work in Texas must be licensed, and that a state license is valid anywhere in the state. TDLR also says a city may not require a municipal exam of a state licensee, though it may still collect building permit fees. Fort Worth's registration is a separate city step that sits on top of the state license. Wattsmith Electric holds Texas electrical contractor license TECL 41806, the state license the city's registration builds on.
Sources: the city's contractor registration page and the TDLR electricians FAQ.
Which electrical code does Fort Worth enforce?
Fort Worth says it has adopted the 2026 National Electrical Code effective September 1, 2026. The state made the same move: TDLR adopted the 2026 NEC as the state electrical code from that date, with a limited exception for ground-fault protection on certain outdoor outlets. Work started on or after that date is built to the 2026 edition.
The city also says each code it adopts has local amendments. For electrical work, the only amendments document the city links today is titled as a draft. Until an adopted ordinance is posted, we confirm any local change with the plan reviewer or the inspector on the job, rather than assuming what a draft says is in force.
Sources: the city's building and energy codes page and TDLR's September 1, 2026 rule adoption.
What is the electrical release in Fort Worth?
The release is the city's approval to put power on the building. Fort Worth's inspection guide offers a temporary electrical release before finals, for temporary power to the building, and an electrical final for permanent power. Oncor's tariff says it will not connect until it receives notice that the proper authority approved the installation.
The inspections that lead to that release are numbered, from the underground and slab inspections before cover to the final. The release box is marked on the electrical permit application itself, so temporary power is planned from the start rather than asked for at the end. Fort Worth's inspection requests made before 6:30 a.m. are scheduled that day, and later ones go to the next business day.
Each step is laid out in our guide to the Fort Worth electrical inspections sequence. Most of Dallas and Fort Worth is served by Oncor, and some edge areas are co-op territory, where the co-op's own rules for connection apply. The Public Utility Commission notes that co-ops and municipal utilities choose whether to join the retail market. Sources: Oncor's Tariff for Retail Delivery Service, Section 5.4.2, and the PUC FAQ on municipal utilities and co-ops.
We carry permits like these for Fort Worth tenant build-outs. For the rest of our work in the city, see the Fort Worth commercial electrician hub, and for everything we do across Texas, our commercial electrical services. The price of the work is set at the free site visit.