Skip to content
Wattsmith Electric

Fort Worth new homes, for builders

New construction electrician Fort Worth for production and custom builders

Builders around Fort Worth hire us to wire new homes, from the temporary pole to the permanent meter. Service calls, repairs and remodels on existing homes stay in the San Antonio area only.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Fort Worth new homes

How does a new Fort Worth home get its electrical service?

In steps. The electrical permit rides under the builder's new construction permit with umbrella fees waived, and a temporary pole built to Oncor's figure powers the build. Rough-in passes inspection 210, the final clears permanent power, and Oncor sets the meter once the city's approval arrives, using the second ESI ID.

The permit under the builder's permit

Fort Worth residential building permits cover one and two family detached homes and go to registered building contractors, with first review comments on a complete application due in seven business days. The city's electrical permit application lists the temporary pole as an item and waives umbrella permit fees under a valid new construction building permit.

  • Umbrella electrical permit under the building permit
  • Temporary pole on the electrical application

The temporary pole

Oncor's guidelines have the builder's side provide the pole, at least a four by four by sixteen foot unspliced post or a treated pole five inches across at the top, marked with the address in numbers three inches high or more. A retail provider has to be chosen before the temporary meter is energized, and Oncor warns a buried or damaged handhole can delay service up to six weeks.

  • Pole built to Oncor's figure
  • Address numbers on the pole
  • Handhole uncovered and undamaged

Rough-in, trim-out and the final

The same numbered inspections apply to a new home: 210 for rough wiring before the wall and ceiling coverings go on, then the electrical final for permanent power. Fort Worth calls the approval that lets power flow a release. We rough in to the builder's schedule, trim out after paint, and set the service entrance for the meter.

  • Whole-house rough-in
  • Device and fixture trim-out
  • Service entrance and meter base

ESI IDs and the permanent meter

Oncor's toolkit asks for one ESI ID for the temporary pole and one for the permanent meter, and under its "Green Tag" step the builder calls the retail provider with the permanent ESI ID. The meter order holds up to 20 work days for the city inspection. For new subdivisions Oncor needs a plat and an easement for its facilities.

Questions about new-construction residential wiring for fort worth home builders? Call or get a quote.

Free Fort Worth estimate

How does a Fort Worth builder get a price on new homes?

Tell us the builder, the subdivision or lots, how many plans and the start date. You hear back the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do Fort Worth home builders ask before hiring an electrician?

Straight answers. If you do not see yours, call us and ask.

Do you wire for both production and custom builders?

Yes, from the plans you send, with a written price for each plan.

What other residential work do you take in Fort Worth?

None. In the Fort Worth area we wire new homes for builders only. Service calls, repairs and remodels on existing homes stay in the San Antonio area only.

Call NowGet a Quote