Skip to content
Wattsmith Electric

Dallas standby power for business

Commercial generator installation Dallas for spring storms and winter ice

Dallas businesses have lost power to a spring storm system and to ice and a statewide grid emergency in winter. With a standby unit and an automatic transfer switch, the circuits a business cannot do without stay up when Oncor's lines go down. We price it after a free visit to the site, and the figure comes to you in writing.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Dallas standby power

Why would a Dallas business put in a commercial standby generator?

Because Dallas loses power in spring and in winter. The May 28, 2024 storm caused more than 650,000 Oncor customer outages. The February 2021 freeze lasted 139 hours at the airport while ERCOT lost 48.6% of its available generation, and the 2023 ice event brought 88 more hours under 32 degrees.

The May 28, 2024 storm

The storm system of May 28, 2024 left Oncor with more than 650,000 customer outages across its DFW territory. By 4 p.m. the next day it had restored more than 400,000 customers, with more than 7,500 personnel, mutual assistance crews included, on 16-hour shifts.

February 2021 and the ice after it

The weather service counted 139 hours at or below freezing at DFW Airport in February 2021, with a low of minus 2 degrees on the 16th. ERCOT's testimony put the loss at 48.6% of the generation the grid had available. The ice and sleet of early 2023 added another 88 hours below freezing.

What goes in, and where

Our part is the unit, its automatic switch and a separate panel for the circuits you keep. Oncor's rule book requires any customer transfer switch to sit after the meter base, never wired in line with the meter, and Dallas lists generators as a project type its Building Code reviewers look at.

  • Unit sized from your list of kept circuits
  • Switch placed after the Oncor meter base
  • A panel of its own for kept circuits
  • Dallas permit and Building Code review

Deciding what stays on

Most Dallas lists begin with coolers, the server closet, phones and alarms, then a few lights and a restroom. That list, made on a walk through with you, sets the unit's size; the full building load does not.

Questions about commercial standby generator installation in dallas? Call or get a quote.

Free Dallas estimate

How does a Dallas business book the free generator site visit?

Include the address, the business and the loads you cannot lose in an outage. We reply the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

Which generator questions come up most from Dallas owners?

Straight answers. If you do not see yours, call us and ask.

How is a Dallas standby generator priced?

The price is set at the free site visit. It depends on the circuits on your list, the switch and how the unit is fueled, and it is written down for you.

Do you pour the pad and run the gas?

Those usually go to a concrete contractor and a plumber. Our estimate spells out which pieces are ours and which are theirs.

Call NowGet a Quote