The 15-minute peak Oncor bills in kW
A business taking power at secondary voltage with demand above 10 kW is on Oncor's Secondary Service Greater Than 10 kW schedule. Its NCP kW is the power used in the busiest 15-minute period of the billing month, and any lights burning in that period are inside the number.