The temporary pole
Oncor's guidelines say construction power starts with a call to Oncor, and no temporary meter is energized until the customer picks a retail electric provider. The customer furnishes the pole, an unspliced 4 by 4 at least 16 feet long, with the street number painted on in figures 3 inches or taller. Oncor owns and hangs the drop, paid for before it builds.
- Provider picked before energizing
- Unspliced pole, 16 feet minimum
- Street number on the pole