Commercial service upgrade Dallas with Oncor's paperwork filed early

Adding capacity to a Dallas building means work on both sides of the meter. Oncor handles its transformer, lateral and meter; we handle the switchgear, feeders and panels the city reviews and inspects. We file Oncor's forms early so its part is not the one holding up the job.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Dallas service work

What does a commercial service upgrade in Dallas involve?

Two tracks. Oncor takes an online request and a load form marked for added load, assigns a Project Manager, and estimates its cost and date. We install the switchgear and panels under a city permit, with load calculations and an emergency disconnect where Chapter 56 calls for them. Only Oncor's employees make the final connection.

Oncor's load form and project manager

When a job needs Oncor construction, such as poles, wire or transformers, the request is filed online and Oncor assigns a Project Manager who calls or emails within two business days. Its commercial load form has a box for adding load to a service that is already energized, and it asks for a site plan showing transformer and meter locations.

  • Online request when Oncor builds
  • Load form marked for added load
  • Site plan with Oncor equipment shown

Oncor's estimate and schedule

Oncor's tariff says that within ten business days of a detailed request it gives an estimated completion date and cost, unless both sides agree otherwise. Construction is scheduled only after contracts, payment and easements are in, and long lead equipment can take months, so we start the request with the design.

What Chapter 56 asks of the new gear

The city's letter on the 2023 NEC flags an emergency disconnect whenever service equipment is replaced, and a Dallas amendment requires load calculations whenever load is added. Plan review then checks the one-line diagram and panel schedules before the switchgear is set.

  • Emergency disconnect with replaced service equipment
  • Load calculations for the added load
  • One-line diagram and panel schedules

Who makes the final connection

Under Chapter 56 only Oncor's authorized employees join Oncor's conductors to the customer's service entrance conductors, and Oncor connects only after the city approves the installation. Oncor also has to be called before a self-contained meter is pulled, and only Oncor may remove a 480 volt self-contained meter.

Keeping the outage short

A service change needs a planned shutdown. We pick the window with you and Oncor, finish testing and labeling the new gear beforehand, and keep the dark period to the swap itself.

  • Shutdown window agreed with you and Oncor
  • Testing done before the shutdown
  • Arc flash warning labels installed on new gear

Questions about commercial service upgrades and switchgear in dallas? Call or get a quote.

Free Dallas estimate

How do I start a commercial service upgrade in Dallas?

Include the address, today's service size if you know it, and what the added load will run. We reply the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do Dallas businesses ask about a larger electrical service?

Straight answers. If you do not see yours, call us and ask.

Does Oncor or my retail provider handle a bigger service?

Oncor. It owns the delivery equipment and sets the meter; your retail provider only sells the electricity and sends the bill.

How soon does Oncor respond to a service request?

Oncor says its Project Manager makes contact within two business days, and its tariff calls for a cost and date estimate within ten business days of a detailed request.

Do you perform arc flash studies?

No. We put up the arc flash warning labels the code requires. A study comes from an engineer, and we follow it when you have one.