Oncor Demand Charges and LED Retrofits: How Lighting Sets the Peak in DFW

November 1, 2026Last updated 7 min readWattsmith Electric · TECL 41806

Key takeaways

  • Secondary voltage service with demand over 10 kW is billed on Oncor's Secondary Service Greater Than 10 kW schedule, on NCP kW: the highest 15 minutes of the month.
  • For most loads over 20 kW, the distribution charge uses an 80% ratchet, the higher of this month's peak or 80% of the highest peak in the previous 11 months.
  • Premises that have reached 700 kW are billed transmission on 4CP kW, set by their demand at the four ERCOT summer peaks of the previous year.
  • Lighting runs through every peak hour, so an LED retrofit lowers demand as well as energy, though a ratchet can hold the billed demand up for months.

Oncor demand charges are the part of a commercial delivery bill that most owners read least and pay attention to only when it jumps. They are set not by how much electricity a building uses in a month but by how much it draws at once, in its busiest 15 minutes. Lighting is one of the few loads that is on through nearly every one of those minutes. This guide sets out how Oncor's tariff bills demand, from the 10 kW line to the ratchet and 4CP, and what an LED retrofit can and cannot change on the bill.

What is a demand charge on an Oncor delivery bill?

It is a charge based on the highest rate at which a building draws power, not the total it uses. Under Oncor's Secondary Service Greater Than 10 kW schedule, the NCP kW used for billing is the kW supplied during the 15-minute period of maximum use in the billing month. One busy quarter hour sets it.

Energy and demand are two different measurements. Energy, in kWh, is the total over the month. Demand, in kW, is the rate of draw, and Oncor reads it as an average over each 15 minute interval, then takes the highest. A building that runs steadily and one that runs everything at once for a single quarter hour can use the same energy and carry very different demand.

The schedule is Sheet 1.3, Section 6.1.1.1.3, of Oncor's Tariff for Retail Delivery Service, listed on its tariffs and rate schedules page.

Which businesses does Oncor bill on demand?

The schedule applies to delivery at secondary voltage with demand greater than 10 kW, to one point of delivery measured through one meter. That covers most storefronts, offices, warehouses and shops. Once a premises is on it, the tariff keeps it there until it completes 12 consecutive billing months with no recorded demand over 10 kW.

A word on territory. Oncor's tariff applies where Oncor delivers. Most of Dallas and Fort Worth is served by Oncor; some edge areas are co-op territory, and a co-op sets its own rates and rules. Check which utility delivers to the address before reading any of this against a bill.

How does Oncor's 80% ratchet work?

For most loads whose highest NCP kW in the previous 11 months was over 20 kW, the billing kW for the distribution charge is the higher of this month's NCP kW or 80% of the highest monthly NCP kW in those 11 months. One high month keeps the billed demand up for the eleven that follow.

The tariff names two exceptions. Loads over 20 kW whose annual load factor is 25% or less are billed on the current month's NCP kW, and so are loads whose highest NCP kW in the prior 11 months was 20 kW or less. For everything else, a single summer afternoon with every load running can set the floor under the bill for almost a year.

  • Prior 11 month peak of 20 kW or less: billed on this month's NCP kW.
  • Over 20 kW with an annual load factor of 25% or less: billed on this month's NCP kW.
  • All other loads: the higher of this month's NCP kW or 80% of the highest NCP kW in the prior 11 months.

What is 4CP, and who is billed on it?

4CP is how Oncor bills transmission to its largest delivery customers. Any premises that has set an NCP kW of at least 700 kW in an earlier billing month is billed on 4CP kW: the average of its 15 minute demand at the moments of ERCOT's monthly system peak in June, July, August and September of the previous year.

The 4CP figure is updated each January 1 and stays fixed for the calendar year. That makes it unusual: what a large building draws during four summer quarter hours sets a line on its bill for the whole of the next year. Those peaks fall on hot afternoons, when cooling and lighting are both running.

Why does lighting sit inside the peak?

Because lighting is on through every working hour, it is part of every 15 minute interval the building is busy, including the one that sets the peak. Cooling, compressors and process equipment cycle on and off. Lighting does not, so every watt of lighting load counts in the busiest quarter hour of the month.

In a warehouse with high bay fixtures, a retail floor lit through business hours, or an office with fluorescent troffers, the lighting load is a steady block under every other load. It also adds heat that the cooling has to remove, so on a summer afternoon older fixtures add to the peak twice: once in their own draw and again in the cooling load they create.

How does an LED retrofit lower energy and demand?

An LED fixture or retrofit kit draws fewer watts than the metal halide, high pressure sodium or fluorescent lighting it replaces, for the light the space needs. Fewer watts for every hour the lights are on lowers energy, and fewer watts in the busiest quarter hour lowers the NCP kW that sets demand.

How much depends on the building, the old fixtures, the hours and what else runs during the peak, which is why we do not quote savings figures before seeing the site. Controls can add to it: occupancy sensors and daylight dimming cut energy in areas that sit empty or near windows. Whether a lighting change moves the peak depends on what is on during the quarter hour that sets it.

See our LED lighting retrofits in Dallas and LED lighting retrofits in Fort Worth pages for what a retrofit covers.

Does the ratchet delay the savings on the bill?

It can, for a load billed under the ratchet. If its highest NCP kW in the past 11 months was set before the retrofit, the billed demand may stay at 80% of that old peak until the old peak ages out. The energy line drops from the first month; the demand line may take up to eleven months to follow.

That is worth knowing before judging a project on its first bills. A retrofit finished in the spring, after a hot summer peak, may show its full effect on demand only after the following summer. For a premises on 4CP, the January update reflects the previous summer's peaks, so the timing of the work against ERCOT's summer months matters as well.

How do you read the demand line on the bill?

Oncor's delivery charges are billed to the business's retail provider, which passes them through, so the layout of the bill is the retailer's. Look for the demand figure in kW, and whether the line shows this month's NCP kW or a higher billing kW. If billing kW sits above this month's peak, the ratchet is setting it.

Keep twelve months of bills side by side. The highest NCP kW in that run is the peak the ratchet is working from, and the month it was set tells you when it ages out. The PUC regulates the rates delivery utilities charge in competitive areas but does not set the retailer's price, so the energy line follows the retail plan while the demand line follows Oncor's tariff.

The PUC explains the split on understanding your electric bill.

What does an LED retrofit need for permit and inspection?

Lighting changes are electrical work, and in Dallas the electrical plans checklist includes the floor plan power and lighting layout. In Fort Worth, the electrical final checklist includes checking that installed fixtures match the fixtures on the COMcheck sheet, the energy code compliance form, so the fixture list should be settled before the final.

We confirm the permit scope with the city at the start, keep the fixture schedule matched to the compliance paperwork, and leave arc flash warning labels on the service equipment as the NEC requires when we work in it. A new service for a building is a separate subject, covered in our Oncor new commercial service guide.

Fort Worth's Electrical Final checklist lists the fixture check. For the utility side of a new or larger service, read Oncor new commercial electric service, and for the permit order, how commercial electrical permits work in Dallas. The Dallas commercial electrician hub lists all our Dallas work, and our commercial electrical services page covers the rest of Texas.

FAQ

Common questions

Straight answers. If you do not see yours, call us and ask.

What sets an Oncor demand charge?

The NCP kW: the kW supplied during the 15 minute period of maximum use in the billing month. For most loads over 20 kW, an 80% ratchet on the prior 11 months can set a higher billing kW.

Will an LED retrofit lower the demand line right away?

The energy line drops from the first month. If the ratchet is working from an older peak, the billed demand may stay up until that peak is more than 11 months old.

What is 4CP on an Oncor bill?

For premises that have reached 700 kW, transmission is billed on the average demand at ERCOT's four monthly summer peaks of the previous year, updated each January 1.

Related help

Where to go from here

Ready to get it handled?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote