Austin Energy Demand Charges: The 15 Minute Peak and LED Retrofits

November 1, 2026Last updated 6 min readWattsmith Electric · TECL 41806

Key takeaways

  • Austin Energy bills commercial demand on the metered kilowatts during the 15 minute interval of greatest use in the billing month.
  • When power factor in that interval is under 90 percent, Austin Energy adjusts the billed kilowatts upward.
  • A business's general service rate class is set each year from its average June through September demand.
  • Lighting that runs through the peak interval counts toward it, which is why an LED retrofit is measured against the peak as well as the energy.

An Austin Energy demand charge is the part of a commercial bill set by how much power the building draws at its busiest moment, not by how much energy it uses over the month. Austin Energy, the City of Austin's own utility, measures that peak in 15 minute intervals and adjusts it for power factor. This guide explains how the peak is measured, how summer demand sets the rate class, what we did and did not find in the tariff, and where lighting and LED retrofits fit, using Austin Energy's FY2027 tariff and its demand charge sheet. It gives no rate figures; those are on the tariff itself.

What is an Austin Energy demand charge?

It is a charge on the business's monthly peak demand for power, measured in kilowatts and called Billed kW. Austin Energy's tariff says Billed kW is the metered kilowatt demand during the 15 minute interval of greatest use in the billing month, as Austin Energy's meter records it, adjusted for power factor.

Energy and demand are two separate measures. Energy, in kilowatt hours, is the total used across the month. Demand, in kilowatts, is the rate of use in the single busiest 15 minutes. Two buildings with the same monthly energy can have very different demand if one starts every unit at once each morning and the other spreads its load out.

The definition is in Austin Energy's FY2027 electric tariff.

Which Austin businesses pay a demand charge?

Austin Energy's demand charge sheet says it applies a demand charge to all commercial customers with a peak demand of 10 kW or more during the summer months. Secondary voltage general service customers fall into three classes: demand under 10 kW with no demand charge, 10 kW to under 300 kW, and 300 kW and up.

General service in the tariff is service delivered at less than 12,470 volts, which covers most shops, offices, restaurants and warehouses. Large General Service, delivered between 12,470 and 69,000 volts, is a separate set of schedules for the largest sites.

Because Austin Energy is a City of Austin department and is not part of retail deregulation, these schedules are Austin Energy's own, published in the City's electric tariff. A business in its service area does not compare retail plans; the tariff for its rate class is the structure it is billed under.

Austin Energy explains the threshold on its demand charge sheet.

How do summer months set the rate class?

The tariff says that to set a customer's general service rate class, the June through September demand data are averaged each year. A building whose summer peaks average near a class line can move between classes from one year to the next, so the summer months carry extra weight in how the bill is built.

In Austin that summer window is when cooling load is highest, and lighting often runs alongside it through the afternoon. Anything that lowers the summer peak interval, from lighting load to how equipment starts in the morning, feeds into both that month's Billed kW and the yearly class average.

Why does power factor change the Austin Energy demand charge?

Because the tariff adjusts Billed kW when power factor in the peak interval is under 90 percent. In that case the billed kilowatts are the metered peak multiplied by a 90 percent power factor divided by the recorded power factor, so a lower power factor raises the kilowatts billed for the same metered peak.

Power factor falls when a building has a lot of inductive load, such as motors running lightly loaded, older magnetic lighting ballasts, or some drives and transformers. Whether a site has a power factor problem shows on its bill and its metering data. Correcting it is a separate piece of engineering from a lighting retrofit, but the two are often looked at together.

Does Austin Energy use a demand ratchet?

We found no demand ratchet text in Austin Energy's FY2027 tariff. A ratchet would carry a past peak forward into later bills. On what we read, the general service demand charge rests on each month's own 15 minute peak, adjusted for power factor, with the summer average setting the class. Ask Austin Energy to confirm.

That matters when weighing a retrofit. Without a ratchet, a lower peak shows on the next bill rather than months later. We say only what the tariff text supports, and we do not estimate savings: Austin Energy's own billing history for the site is the record any comparison starts from.

How does lighting affect the 15 minute peak?

Lighting counts toward the peak whenever it is on during the busiest interval. In most commercial buildings the lights are on through the working day, so the whole connected lighting load is likely inside the peak. Unlike cooling, it runs at full draw every hour it is on, so it is a steady part of every peak interval.

That is what makes lighting a useful place to start. Replacing fixtures with LED reduces the connected load directly, and controls such as occupancy sensors and daylight dimming can lower what is on during the busiest interval. Both act on the same 15 minute window the demand charge is set on.

How can an owner read the peak on an Austin Energy bill?

Look for the Billed kW on each month's bill and line up twelve months side by side. The highest summer months show the peaks that set the rate class, and a month that jumps above its neighbors usually points to a single event, such as equipment starting together or a long cooling day, worth tracing.

Comparing Billed kW with the energy used in the same month gives a rough sense of how peaky the building is. A site that uses little energy but carries a high Billed kW draws a lot of power for short stretches. In general practice that pattern points first at what starts together in the morning and what runs through the hottest afternoon hours.

Lighting is only one lever. Staggering the start of rooftop units, scheduling EV chargers away from the busiest hours, and reviewing large motor loads all act on the same 15 minute window. A lighting retrofit is often the simplest to plan because the load is known fixture by fixture, but it works best when the rest of the peak is understood as well.

How is an LED retrofit weighed against demand?

In general practice a lighting audit counts every fixture, its wattage, its hours and its controls, then compares the existing connected load with the proposed LED load. The difference is the kilowatts taken out of the peak, and the hours give the energy. Austin Energy's bills for the site show the real peak to compare against.

  • Fixture count and type for each area.
  • Existing and proposed wattage per fixture.
  • Operating hours and which areas run through the summer afternoon.
  • Existing controls and any controls to add.
  • Twelve months of Austin Energy bills for the site's Billed kW history.

The written estimate sets out the fixtures, the controls and the electrical work, such as rewiring circuits under NEC Article 210 where the layout changes. The price is set after the free written estimate, and any figure for the bill effect is worked from the site's own Austin Energy history, not from a general rule.

See our Austin LED lighting retrofit page for the work itself. If a retrofit comes with a service change, our guide to Austin Energy new commercial service covers the utility's steps. The Austin commercial electrician hub and our commercial electrical services page list the rest of our work, and Austin Energy's place outside retail choice is on its statewide grid page.

FAQ

Common questions

Straight answers. If you do not see yours, call us and ask.

How does Austin Energy measure commercial demand?

On the metered kilowatts during the 15 minute interval of greatest use in the billing month, adjusted when power factor in that interval is under 90 percent.

Do small Austin businesses pay a demand charge?

Austin Energy applies a demand charge to commercial customers with a summer peak of 10 kW or more. The secondary voltage class under 10 kW has no demand charge.

Will an LED retrofit lower my Austin Energy demand charge?

LED fixtures reduce the connected lighting load, which counts toward the peak when the lights are on in the busiest interval. The effect is worked from the site's own billing history.

Related help

Where to go from here

Ready to get it handled?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote