Parking Lot LED Retrofit in Fort Worth: Poles, Heads, Wiring and Controls

November 1, 2026Last updated 6 min readWattsmith Electric · TECL 41806

Key takeaways

  • A lot survey checks every pole, base, head and buried circuit before anything is ordered.
  • Old underground circuits are tested; failed runs are replaced in new conduit, inspected as Fort Worth 205 before backfill.
  • Photocells, time clocks and dimming decide when the lot is lit and how bright, after hours and through the night.
  • The Fort Worth final checks that installed fixtures match the COMcheck fixture list.
  • Oncor bills demand on the 15-minute peak of the month, so whether lot lighting moves the bill depends on when the building peaks.

A parking lot LED retrofit in Fort Worth replaces the old metal halide or high pressure sodium heads on a lot's poles with LED fixtures, and usually fixes what has gone wrong underneath them. The heads are the visible part. The poles, the anchor bases, the buried circuits and the controls decide whether the new lighting works for the next twenty winters or fails at the first wet week. This guide walks through each part of the lot, the underground work and its Fort Worth inspection, the controls, the permit, and how Oncor's demand billing relates to lighting that runs at night.

What does a parking lot lighting survey check?

Every pole, every head and every circuit. We count the poles and heads, note their mounting heights and spacing, check each pole for rust at the base and each anchor base for cracked concrete, and test the buried circuits that feed them. Dark poles and tripped breakers point to the runs that need work.

The survey also maps where the light falls today. A lot lit by aging heads often has bright pools under the poles and dark gaps between them, worst at the far rows and the entrances. The new fixtures are chosen for the pole height and spacing that exist, with optics that spread light across the rows rather than straight down. Where a dark corner needs a new pole, that shows up in the survey, not after the heads are hung.

Can the existing poles and bases be reused?

Often, if they pass inspection. A sound steel or aluminum pole on a solid anchor base can carry a new LED head, and LED fixtures are usually lighter than the heads they replace. Poles rusted through at the base, bent, or on cracked bases are replaced before new heads go up.

The head mounting matters as much as the pole. Many retrofits use an adapter or a new arm that fits the existing pole top or drill pattern. Each pole also needs a sound hand hole cover, a working ground and conductors inside the pole that are not cracked or brittle from decades of heat. North Texas weather is hard on lot fixtures: the National Weather Service recorded hail up to softball size in the Metroplex area in April 2026, in reports it marks preliminary, so impact rated fixtures are worth considering for exposed lots.

Source: NWS Fort Worth's April 2026 severe weather summary.

What happens to the underground wiring in a lot retrofit?

It is tested first, then reused or replaced. Old lot circuits often run in conduit that has broken under traffic or in direct buried cable that has failed in places. We test each circuit's insulation; runs that pass can stay, and runs that fail get new conductors or new conduit.

Replacing a failed run means a trench across the lot or boring under it, with new conduit between the poles and back to the lighting panel. The NEC sets minimum cover depths for buried wiring that depend on the wiring method and where it runs, such as under a driveway or a parking area. The one burial figure in Oncor's Electric Service Guidelines is for the utility's service lateral: that conduit must meet the 24 inch NEC burial depth to the top of the conduit, and on commercial jobs Oncor inspects it before cover. Lot lighting circuits are the customer's wiring and follow the NEC depth for their own method.

Source: Oncor's Electric Service Guidelines, February 2025.

When is the Fort Worth 205 underground inspection called?

After the trench is dug and bedded and the conduit is in, and before any backfill goes in. Fort Worth's inspection guide numbers it 205, Electrical Underground, for conduit or duct banks. On a lot retrofit with new runs, the trench stays open until the inspector has seen it.

That shapes the schedule. Trenching across a working lot means closing rows, and an open trench cannot be filled until the inspection passes. Fort Worth schedules inspection requests received before 6:30 a.m. for that day, and later requests for the next business day, through Accela Citizen Access or the city's inspection line. We trench, lay conduit and call the inspection in sections, so the lot can stay partly open for business while the work moves across it.

Sources: the city's What Inspections Do I Need? guide and the Fort Worth inspections page.

Which controls belong on a retrofitted parking lot?

At least a photocell or astronomical time clock to turn the lot on at dusk and off at dawn. Many owners add a schedule that dims the lot after closing, and motion sensors that bring a pole to full brightness when a car or person comes near. LED fixtures respond to dimming instantly.

Old metal halide lots often ran on a single contactor and a photocell that failed years ago, leaving the lights on all day or off all night. A retrofit is the time to replace that with controls that suit how the property is used. A retail center may want full light until the last store closes, then a lower level for security. An office lot may dim most of the night. Controls can be set per pole or per circuit, wired back to the panel or wireless from each head.

What permit does a parking lot LED retrofit need in Fort Worth?

An electrical permit, applied for through Accela Citizen Access. Where the work is part of a job that also carries a building permit, Fort Worth issues the building permit first. The city enforces the 2026 NEC on work started from September 1, 2026, and the work is inspected before cover and again at the final.

The 200 Electrical Final checklist includes a check that the fixtures installed match the fixtures listed on the COMcheck sheet, the energy code compliance form, so the fixture list on the paperwork and the heads on the poles have to agree. The checklist also covers grounding and bonding of service equipment. If a pole or a fixture is swapped during the job, the COMcheck is updated to match before the final is called.

Sources: the city's permits page, Accela Citizen Access portal, 200 Electrical Final checklist and building and energy codes page.

How does Oncor's demand billing relate to parking lot lighting?

It depends on when the building peaks. On Oncor's Secondary Service Greater Than 10 kW schedule, the NCP kW is the demand supplied during the 15-minute period of maximum use in the billing month. Lot lighting that runs at night only moves that peak if the building peaks at night.

Most commercial buildings peak during the day, when lot lights are off, so a lighting retrofit mainly lowers the energy used through the night rather than the monthly peak. A business open after dark, such as a restaurant or a gym, may carry its lot lighting inside its evening peak, and there lower lighting load does reach the demand figure. For most loads over 20 kW, the distribution charge also carries an 80% ratchet against the highest peak in the previous 11 months. We work out how the lot's load sits against the building's peak from its own meter history, and the price of the retrofit is set after the free written estimate.

Sources: Oncor's Tariff for Retail Delivery Service, Section 6.1.1.1.3, and the PUC's guide to understanding your bill. Most Fort Worth addresses are served by Oncor; some edge areas are co-op territory with their own rate schedules.

We do this work as Fort Worth LED lighting retrofits. If chargers are coming to the same lot, plan the trenches together; see our guide to EV charging for Fort Worth businesses. See also the Fort Worth commercial electrician hub and our commercial electrical services.

FAQ

Common questions

Straight answers. If you do not see yours, call us and ask.

Do we have to replace the poles for an LED retrofit?

Not if they pass inspection. Sound poles on solid anchor bases usually carry new LED heads. Poles rusted at the base, bent or on cracked bases are replaced.

Is new conduit in the lot inspected in Fort Worth?

Yes. It is inspection 205, Electrical Underground, after the trench is bedded and the conduit is in, before any backfill.

Will an LED lot retrofit lower our Oncor demand charge?

Only if lot lighting runs during the building's peak 15 minutes of the month. Most buildings peak by day, so the change shows mainly in energy used at night.

Ready to get it handled?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote