Tenant build-out electrical contractor Austin from plan review to the 305 final

Before an Austin suite opens, its wiring has to clear plan review and a set of inspections the City numbers in order. We price the build-out from your drawings, file through the AB+C Portal, and plan each trip from San Antonio around the next inspection on the list.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Austin build-outs

How does an Austin tenant build-out get its electrical approval?

The application is filed in the AB+C Portal, and review begins once the invoice is paid. Inspections follow the City's order: 302 Grounding and 300 Slab, 301 Rough after dry-in, then 304 Temporary and 305 Final. A tenant who needs in early can take a 306 Occupancy or 307 Stocking TCO inspection first.

Commercial plan review in AB+C

The application goes in through the City's Commercial Building Permit Web Form, and the review clock starts only after the invoice is paid. Plans are checked against the 2024 International Building Code. The City's posted review times run from one business day for Quick Turnaround to between 7 and 25 business days, depending on the application type.

  • Web form filed in the AB+C Portal
  • Review starts once the invoice is paid
  • Review time set by application type

Electrical questions before submittal

Development Services offers a Commercial Electrical Codes appointment for NEC questions on a plan, while Austin Energy design questions go to Austin Energy. Plan review may also be needed when a commercial property asks for more than one trade permit, so we settle the permit path while the drawings are still being drawn.

The numbered inspections

The City's flowchart starts with 302 Grounding and 300 Slab, then 301 Rough, which waits until the building is dried in and both earlier inspections are approved. The final stage holds 304 Temporary and 305 Final. The contractor books each one, and the City says most happen within 24 hours, sometimes 48.

  • 302 Grounding and 300 Slab
  • 301 Rough once dried in
  • 304 Temporary, then 305 Final

Occupancy or stocking before the final

When a tenant needs in early, Austin has two separate TCO inspections. 306 Occupancy wants every life-safety device and light fixture installed and working, while 307 Stocking only lets goods in once the rough-in inspections are done. The flowchart notes the TCO fees must be paid ahead of time.

Offices, labs and storefronts

A May 2026 Council document names corporate headquarters and life sciences among Austin's target sectors, so office floors and lab or clinic suites make up much of the build-out work, next to shops and restaurants. Each suite is walked and priced from its own plan set.

  • Office and headquarters floors
  • Lab and clinic suites
  • Retail and restaurant spaces

Questions about tenant build-out electrical work in austin? Call or get a quote.

Free Austin estimate

How do I get a price on an Austin tenant build-out?

Give the address, the square footage and your target opening date, and attach or describe the drawings. We answer the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do tenants and general contractors ask about Austin build-out wiring?

Straight answers. If you do not see yours, call us and ask.

Where do Austin build-out permits get filed?

In the Austin Build + Connect Portal, through the Commercial Building Permit Web Form. Inspections are booked there or by phone.

Can a tenant stock an Austin suite before the final?

Yes, after a 307 Stocking TCO inspection, which needs the rough-in inspections complete. Moving people in early takes a 306 Occupancy inspection instead.

Do you work to the general contractor's schedule?

Yes. Each trip is set by the inspection coming up, and the general contractor hears ahead of time what we will finish on it.