Skip to content
Wattsmith Electric

Austin commercial lighting

Commercial LED lighting retrofit Austin for offices, warehouses and lots

Austin Energy bills most commercial buildings for their peak kW as well as their kilowatt-hours, and lights that burn through the busiest part of the day count in both. We swap fixtures to LED, measure the load that comes off, and put the price in a free written estimate.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Austin lighting work

Why does an LED retrofit change an Austin commercial electric bill?

Austin Energy bills commercial demand on the metered kW in the busiest 15 minutes of each month, adjusted when power factor falls below 90 percent. Lights burning in that interval are part of it. The June through September average also sets the rate class, so cutting summer lighting load lowers both energy and demand.

Billed kW and the busiest 15 minutes

Austin Energy's FY2027 tariff measures commercial demand as the metered kilowatts in the 15-minute interval of greatest use in the billing month. If the power factor in that interval is below 90 percent, the billed kW is adjusted upward. Lighting running during that interval is part of the figure.

Summer demand sets the class

The tariff averages each building's June through September demand to pick its general service class: under 10 kW, 10 kW to under 300 kW, or 300 kW and up. Austin Energy's own sheet says a demand charge applies to every commercial customer peaking at 10 kW or more in the summer months, so summer lighting load matters most.

Before and after on the bill

We ask for a year of bills, summer months included, so the demand line can be compared once the new fixtures are in. Austin Energy bills directly; there is no retail provider in between.

  • Bills covering June through September
  • Fixture counts and burn hours
  • Which areas are lit at the peak

The fixtures we replace

Most Austin retrofits cover high bays in warehouse and flex space, troffers and cans on office floors, garage and canopy lights, wall packs, and parking lot poles. Where the layout calls for it we rework the switching and add occupancy sensors, and we fix wiring faults the old fixtures were hiding.

  • Warehouse and flex space high bays
  • Office troffers and downlights
  • Garages, canopies and lot poles
  • Occupancy sensors and switching

Questions about commercial led lighting retrofits in austin? Call or get a quote.

Free Austin estimate

How do I get an LED retrofit estimate for an Austin building?

Give the type of building, a rough count of fixtures and the hours it is open; a summer bill helps. We answer the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do Austin building owners ask about LED retrofits?

Straight answers. If you do not see yours, call us and ask.

Can an LED retrofit change my Austin Energy rate class?

It can lower the summer demand the class is set from. Whether a building drops a class depends on how close its June through September average sits to the 10 kW or 300 kW line.

Can fixture work be done outside business hours?

Yes. We schedule it around when you are open, and the written estimate shows when each area will be done.

Call NowGet a Quote