Skip to content
Wattsmith Electric

Austin new homes, for builders

New construction electrician Austin for production and custom builders

Austin home builders hire us to wire new houses, from the construction loop to the day Austin Energy turns on permanent power. Service calls, repairs and remodels on existing homes stay in the San Antonio area only.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Austin new homes

What are the steps to power a new house built in Austin?

Construction power comes on a Home Builder Loop, which needs a City permit, a City inspection and an Austin Energy application. Austin Energy sets the spot the day after the permit is active and inspects the conduit with the trench open. The 304 inspection then serves as the Request for Permanent Power, and Austin Energy energizes.

The Home Builder Loop

Austin Energy calls construction power for single and duplex homes a Home Builder Loop, a single-phase meter loop with a meter can of at least 200 amps. Each loop still needs a City permit and a City inspection before it is used, plus an application to Austin Energy, which charges its labor for temporary power before installing it.

  • Meter can of 200 amps or more
  • City permit and inspection first
  • Application to Austin Energy

Residential plan review

The City reviews new single-family, duplex and two-family houses to the 2024 IRC and the Chapter 25-12 local amendments, and posts 10 business days for new construction. Since October 2026 Austin Energy no longer needs the Building Service Planning Application with residential permit applications.

Spot location and the open trench

Austin Energy sends a request to set the service point the day after the electric permit becomes active, and it will not mark the spot before then. Its conduit inspection is called while the trench is still open, and the load side conduit is inspected by Development Services.

  • Spot set once the permit is active
  • Conduit inspected before backfill
  • Load side conduit inspected by the City

The 304 and permanent power

On a new home the 304 Temporary inspection is the Request for Permanent Power, granted on the inspector's approval. It needs the grounding inspection passed, the meter location approved by the utility, and a surge protective device in place. After the City approves, the customer calls Austin Energy at 512-494-9400, and Austin Energy energizes.

Questions about new-construction residential wiring for austin home builders? Call or get a quote.

Free Austin estimate

Can an Austin builder send plans for a per-plan price?

Give the builder, the subdivision or lots, how many plans and the start date. We answer the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

Which questions do Austin builders raise first?

Straight answers. If you do not see yours, call us and ask.

Do you wire for tract builders, custom builders, or both around Austin?

Both. Send the plan set and we price it plan by plan.

Will you take other residential jobs around Austin?

No. Around Austin our residential work is new construction for builders. Service calls, repairs and remodels on existing homes stay in the San Antonio area only.

Call NowGet a Quote