Commercial service upgrade Austin with the ESPA filed at the start

A bigger service in Austin is a project with two owners. Austin Energy designs and builds its side of the meter; we install the switchgear, feeders and panels the City permits and inspects. We file Austin Energy's paperwork early so its design is not the step that holds the building up.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Austin service work

What does a commercial service upgrade in Austin involve?

An ESPA listing the connected load, filed with Austin Energy, which designs any service over 225 amps three-phase or 350 amps single-phase. Distribution Metering approves the gear before it is bought. We install it under a City permit, and Austin Energy connects once the ESPA, permit, inspections and account are complete.

The ESPA comes first

Austin Energy's Electric Service Planning Application is needed both for its design and by Development Services before it will issue the electric permit. The form has to state the total undiversified connected load for each piece of equipment, so Austin Energy can size its transformer and lines. An AutoCAD site plan and a riser diagram go in with it.

  • ESPA for every address
  • Connected load listed item by item
  • AutoCAD site plan and riser diagram

When Austin Energy has to design

Services over 350 amps single-phase or 225 amps three-phase, every Downtown Network project, and any job needing an Austin Energy design go through its Design Intake. A load over 320 amps continuous must move to CT metering through the same process. The City's Quick Turnaround review is not open to projects needing large new services.

Metering approval and the CT inspection

Before any service equipment is bought, Austin Energy's Distribution Metering must approve it, and the utility advises ordering metering gear early because supply chain delays can slow a job. On a CT service, Austin Energy inspects before a meter is set, and that inspection has to pass before the City's 305 final is called.

What has to be done before Austin Energy energizes

Austin Energy schedules the connection only after five things: an approved ESPA, a City electric permit, work built to its design, every required inspection passed, and an account set up by calling 512-494-9400. Its Design Criteria also want the City's notification of a passed electrical inspection three regular working days before the service is energized.

  • Approved ESPA and City permit
  • Inspections passed
  • Austin Energy account in place

A short, planned outage

Swapping a service means a scheduled shutdown. We set the window with you and Austin Energy, test and label the new gear in advance, and hold the dark time to the changeover itself.

  • Shutdown window set with you and Austin Energy
  • New gear tested before the shutdown
  • Arc flash warning labels on the new equipment

Questions about commercial service upgrades and switchgear in austin? Call or get a quote.

Free Austin estimate

How do I start a commercial service upgrade in Austin?

Give the address, the present service size if you know it, and what the new load will power. We answer the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do Austin businesses ask about a larger electrical service?

Straight answers. If you do not see yours, call us and ask.

Does Austin Energy publish a timeline for new service?

No fixed one. Austin Energy says the timeline to energization starts when the request is submitted, which is why we file the ESPA with the design.

Is Austin Energy's Design Criteria current?

The manual on its site is the edition effective December 12, 2023, and Austin Energy notes that some processes in it are out of date. We confirm each step with Austin Energy on the job.

Do you do arc flash studies?

No. We install the arc flash warning labels the code calls for. Studies are an engineer's work, and we build to one when you have it.