Skip to content
Wattsmith Electric

Corpus Christi standby power for business

Commercial generator installation Corpus Christi for hurricane season and hard freezes

Coastal Bend businesses lose power to hurricanes in late summer and, as February 2021 showed, to freezes and grid emergencies in winter. A standby generator with an automatic transfer switch keeps your essential circuits running while the lines are down. The price is set at the free site visit and given to you in writing.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Corpus Christi standby power

Why would a Corpus Christi business put in a commercial standby generator?

Because the Coastal Bend loses power to hurricanes and to winter grid emergencies. AEP Texas reported 220,000 outages at Harvey's peak in 2017, with 96% restored by day 14. In February 2021 its largest remaining outages included the Corpus Christi district, while ERCOT lost 48.6% of its available generation at the worst.

Hurricane Harvey, 2017

The weather service says Corpus Christi International Airport recorded a 63 mph gust before going offline as Harvey came ashore, and tens of thousands of South Texas residents and businesses lost power for days. AEP Texas reported 220,000 outages at the peak, 96% restored by day 14, and 5,726 distribution poles damaged or replaced.

Celia, and the coastline AEP serves

Hurricane Celia struck on August 3, 1970 as a Category 4, with sustained winds of 140 mph measured at the airport and over 3,000 power poles knocked down, according to the weather service. AEP Texas describes its Central Division, which includes Corpus Christi, as having 240 miles of coastal exposure, the most of any utility in the state.

The February 2021 freeze

By February 20, 2021 AEP Texas had restored more than 460,000 customers after the storm and load shed, and it said the largest remaining outages were in its Rio Grande Valley and Corpus Christi districts. ERCOT told Congress the storm took out 48.6% of the generation available to the grid at its worst.

What gets installed, and AEP's rules

We install the unit, its automatic transfer switch and a separate panel for the circuits you keep. AEP's guide says the company must be told about an emergency standby system so it can rule out backfeed, and transfer equipment must follow the NEC. Generation that runs in parallel with the grid goes through AEP Texas's PowerClerk application instead.

  • Unit sized from your list of kept circuits
  • Automatic transfer switch to NEC rules
  • Notice to AEP Texas before startup
  • City permit and inspection

Choosing the circuits that stay on

Most lists here start with refrigeration, the server closet, phones, alarms and pumps, then some lighting and a restroom. We build that list on a walk with you, and the list, not the whole building's load, decides the unit size.

Questions about commercial standby generator installation in corpus christi? Call or get a quote.

Free Corpus Christi estimate

How does a Corpus Christi business book the free generator site visit?

Send the address, the kind of business and the loads you cannot lose in a storm. We answer the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

Which generator questions come up most from Corpus Christi owners?

Straight answers. If you do not see yours, call us and ask.

How is a Corpus Christi standby generator priced?

The price is set at the free site visit. It depends on the circuits on your list, the transfer switch and the fuel, and you get it in writing.

Who pours the pad and runs the fuel line?

Usually a concrete contractor and a plumber. The estimate says plainly which parts are ours and which belong to them.

Call NowGet a Quote