Skip to content
Wattsmith Electric

Corpus Christi preventive electrical maintenance

Commercial electrical maintenance Corpus Christi scheduled ahead of storm season

Gear on the Coastal Bend works in heat, humidity and salt air, and a loose or corroding connection runs hot long before it fails. A maintenance agreement puts our electricians in your building on a set schedule, with a written report left after each visit.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Corpus Christi maintenance

What does a commercial electrical maintenance agreement in Corpus Christi include?

Scheduled checks of panels and terminations, infrared scans of equipment under load, and a written report after each visit. Near the bay we also look closely at outdoor gear for rust, and we place one visit before hurricane season to run the generator and transfer switch. Agreement customers get priority dispatch.

Scheduled visits, written reports

Each visit includes panel and termination checks, an infrared scan of equipment running under load, and a written condition report that lists what we found and what a repair would take.

  • Panels and terminations checked
  • Infrared scan under load
  • Written condition report every visit

Salt air and outdoor gear

The one official corrosion rule we found is AEP's: within 30 miles of the Texas Gulf coast, customer-owned CT enclosures must be aluminum or fiber-reinforced polyester. Beyond that, our practice near the bay is to look closely at outdoor disconnects, meter cans, rooftop unit circuits and fastenings for rust, and to note anything that should be replaced.

  • Outdoor disconnects and meter cans
  • Rooftop equipment circuits
  • CT enclosure material near the coast

A visit before storm season

We time one visit ahead of hurricane season to run the generator and transfer switch and check exterior service gear. Nueces County is one of TDI's First Tier windstorm counties, and TDI lists plumbing and electrical repairs among the work that needs no windstorm inspection.

  • Generator and transfer switch run
  • Exterior service equipment check

One licensed contractor each time

TDLR requires an electrical contractor to employ a licensed master electrician and to keep business liability insurance at the required limits. Corpus Christi adds its own contractor registration, and we register with the city before a Corpus Christi permit is bought, as the city requires.

When a visit finds a problem

Small items the agreement covers are handled on the visit. Larger work gets a written price first, is scheduled with you, and goes under a city permit when the work calls for one.

Questions about commercial electrical maintenance agreements in corpus christi? Call or get a quote.

Free Corpus Christi estimate

How do I set up a maintenance agreement for a Corpus Christi building?

Send the address, the type of building and the equipment to be covered. We answer the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do Corpus Christi facility managers ask about electrical maintenance?

Straight answers. If you do not see yours, call us and ask.

How many visits come with an agreement?

We set the schedule with you by how hard the equipment works, with one visit placed before hurricane season.

Do agreement customers get priority in an emergency?

Yes. Agreement customers get priority dispatch, which in Corpus Christi means the next available crew making the drive from San Antonio.

Call NowGet a Quote