Key takeaways
- AEP Texas reported 220,000 outages at Harvey's peak and power back to 96 percent of them by day 14.
- NWS Corpus Christi records Celia's 140 mph sustained winds at the city's airport in 1970, and more than 3,000 power poles down.
- Winter Storm Uri took out 48.6% of the generation available to ERCOT at its worst, so a standby plan covers cold as well as wind.
- AEP's guide says the company shall be notified before an emergency standby power system is installed, so nothing back feeds its lines.
- Most business generators are optional standby under NEC Article 702, permitted through the City's Dynamic Portal, priced at the free site visit.
Hurricane standby power for a Corpus Christi business is planned around storms the Coastal Bend has already lived through. Harvey came ashore northeast of the city in 2017, Celia's winds were measured at the city's own airport in 1970, and Winter Storm Uri showed in 2021 that a freeze can cut power as surely as a hurricane. A building that keeps its refrigeration, controls or lights on through those days has a generator, a transfer switch and a chosen set of loads wired before the storm. This guide covers what the National Weather Service, AEP Texas and ERCOT recorded, how a commercial standby system is built, and what AEP Texas and the City ask for first.
What did Hurricane Harvey do to power in Corpus Christi?
The eye came ashore about 30 miles northeast of the city, near Rockport and Fulton, around 10 PM CDT on August 25, 2017. The National Weather Service says damaging gusts still reached Corpus Christi, the airport logged a 63 mph gust before it went offline, and tens of thousands lost power for days.
NWS Corpus Christi calls Harvey the first Category 4, and the first major hurricane, to make landfall on the Middle Texas Coast since Celia in 1970. The highest gust it lists was 145 mph, measured 8 meters above the ground at the Aransas County Airport in Rockport. Around Corpus Christi the office notes many trees, fences and power poles down, with structural damage much more isolated. For a business that often means the building stands while its power does not, and the office says the hardest hit areas were likely without power for several weeks.
Source: the National Weather Service Corpus Christi Hurricane Harvey summary.
Why does Hurricane Celia still matter to a standby plan?
Because Celia is the storm that hit the city itself. NWS Corpus Christi records Celia, on August 3, 1970, as a Category 4 with sustained winds of 140 mph measured at Corpus Christi International Airport. It says 70 percent of the city's residences suffered some damage and more than 3,000 power poles were knocked down.
Harvey and Celia landed 47 years apart, and a plan drawn around the last storm's track misses the point. A standby system is sized for the loads a business cannot lose, not for one storm. Wind takes down poles and lines in an afternoon; rebuilding them is the long part, and it runs in the order the utility can restore its system, which no single customer controls.
Source: the National Weather Service Corpus Christi Hurricane Celia summary.
How long did AEP Texas take to restore power after Harvey?
AEP Texas reported 220,000 outages at Harvey's peak and said it restored power to 96 percent of those customers by day 14, with the work of 5,600 people. Its update, posted by ERCOT in October 2017, lists Corpus Christi among the areas hit, with Port Aransas, Aransas Pass, Rockport, Fulton and Victoria.
The same deck counts the damage behind that timeline: 5,726 distribution poles and 1,413 transformers damaged or replaced, 68 substations affected, and 549 transmission line structures down. AEP Texas also describes its Central Division, the former AEP Texas Central Company area that takes in Corpus Christi, as having 240 miles of coastal exposure, the most of any utility in the state. Four percent still dark after two weeks is a small share of customers and a long wait for each business inside it.
Sources: AEP Texas's Hurricane Harvey update, as posted by ERCOT and its release on coastal exposure.
What did Winter Storm Uri add to the picture?
That a freeze can cut power with no wind at all. ERCOT told Congress that at its worst the February 2021 storm took out 48.6% of the generation available to the grid, and that without controlled outages power could have been out for 90% of Texans for weeks.
In AEP Texas territory, the company said on February 20, 2021 that it had restored more than 460,000 customers who lost power that week to the weather or the load shed, with the largest remaining outages in its Rio Grande Valley and Corpus Christi districts. ERCOT's generator outage report puts the most unavailable capacity at 52,037 MW, about 8:00 AM on February 16. A shortage at the power plants is not something line crews can fix, so a coastal standby plan has to work in a hard freeze as well as after a hurricane.
Sources: ERCOT's statement to Congress, March 24, 2021, its generator outages report, and AEP Texas's February 20, 2021 update.
What is a commercial standby power system?
It is a permanently installed generator, a transfer switch and the wiring that moves chosen loads to the generator when utility power fails. The transfer switch watches the utility supply, starts the generator, and shifts the loads once it is ready. When utility power returns, the switch moves the loads back.
The choice of loads drives everything after it. Some owners back up the whole building. Most pick the circuits the business cannot lose, such as refrigeration, a server room, pumps and security lighting, and move them to a separate panel fed through the transfer switch. The fuel supply, the run time wanted between refills, and a spot for the unit that sits clear of building openings and above standing water are settled at the site visit, before any equipment is chosen.
Which NEC articles apply to standby power?
Three, depending on what the system feeds. Article 700 covers emergency systems that protect life, such as egress lighting. Article 701 covers legally required standby systems that a code or authority demands. Article 702 covers optional standby, the systems a business chooses to protect its operations, which is where most commercial generators fall.
The article decides how the system is wired. Emergency and legally required systems carry stricter rules on transfer time, wiring separation and testing, so they are kept apart from optional loads, often on their own transfer switch. AEP's guide adds a grounding point for the transfer equipment: if the transfer switch opens and closes the neutral, the generator shall be grounded, and the guide points to the informational note under NEC 250.30.
What does AEP Texas require before a standby generator goes in?
Notice. AEP's Guide for Electric Service and Meter Installations says the company shall be notified of a customer's intention to install an emergency standby power system, so it can make sure nothing back feeds its lines. The same section says the transfer equipment is installed in accordance with the NEC.
Back feed is the hazard behind the rule. A generator tied in without a proper transfer switch can push power onto lines that restoration crews expect to be dead, which is the last thing anyone wants after a hurricane. AEP Texas's Installing Generating Equipment page sends solar, storage and generation that runs in parallel with the grid through its PowerClerk application. A standby system on a transfer switch that never parallels the grid is a different case, and the guide's notification line is the rule we follow for it.
Sources: AEP's Guide for Electric Service and Meter Installations (2026), Section 15.0, and AEP Texas's Installing Generating Equipment page.
How is a standby system permitted in Corpus Christi?
Through a City electrical permit, applied for in the Dynamic Portal, the City's Infor-based permit system. On a new building, the electrical permit is a child permit that waits until the master building permit is approved and paid. Inspections are scheduled in the same portal and appear only once the permit fees are paid.
After a storm the state's rules matter as much as the City's. TDLR reminds the public that anyone doing electrical work in Texas must be licensed and must work through a TDLR-licensed electrical contractor, and that any required city or county permit should be in hand before work begins. Wattsmith Electric holds Texas electrical contractor license TECL 41806. Installing a standby system before the season is calmer than after a storm, when every electrician and every inspector in the region is busy.
Sources: the City's building permits page, its Dynamic Portal guides, the commercial permit checklist, DSD-2001, and TDLR's storm repair reminder.
How is the price of a standby system set?
At the free site visit. The price depends on the loads chosen, the generator size those loads call for, the transfer switch, the fuel supply and where the unit can sit. We walk the building, list the loads with you, and give the price in writing before any work is scheduled.
Sizing starts from the loads, not from a nameplate. Each load's running draw is added, motor starts are allowed for, and room is left for anything the business plans to add. Upkeep keeps the system ready: a generator that sat idle through a quiet season needs its exercise runs, fuel checks and transfer tests before the next storm, not during it.
We install these systems as Corpus Christi standby generators and keep them ready under Corpus Christi maintenance agreements. How AEP Texas connects after the City approves is in our guide to the Corpus Christi service release. See also Corpus Christi commercial and industrial electrical work and our commercial electrical services.